Modeling Spare Parts Demands Forecast under Two-Dimensional Preventive Maintenance Policy

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An optimal sequential preventive maintenance policy under stochastic maintenance quality

This article may be used for research, teaching, and private study purposes. Any substantial or systematic reproduction, redistribution, reselling, loan, sub-licensing, systematic supply, or distribution in any form to anyone is expressly forbidden. The publisher does not give any warranty express or implied or make any representation that the contents will be complete or accurate or up to date...

متن کامل

Preventive-maintenance policy for leased products under various maintenance costs

This paper investigates the effects of preventive-maintenance cost functions on the optimal preventive-maintenance policy for a leased product with Weibull life-time distribution. During the lease period, any product failures are rectified by minimal repairs and may incur a penalty to the lessor, if the time duration for performing a minimal repair exceeds a pre-specified time limit. To reduce ...

متن کامل

Preventive maintenance strategy oPtimizing model under two-dimensional warranty Policy model oPtymalizacji strategii konserwacji zaPobiegawczej w warunkach dwuwymiarowej Polityki gwarancyjnej

An effective warranty servicing strategy should be made considering both warranty cost and product availability. Based on the two-dimensional free repair warranty, a strategy combining the imperfect preventive maintenance and minimal repair is proposed where the imperfect preventive maintenances are implemented in a special subregion of the warranty and all other failures are repaired minimally...

متن کامل

Optimal Preventive Maintenance Policy under a Budget Constraint

We design an optimal preventive maintenance policy for a system of N items that minimizes the total expected maintenance cost. We assume that the budget for preventive maintenance is limited and constrained. The problem has a finite time horizon and we consider constant inter-preventive maintenance times for every item. The resulting nonlinear optimization problem is reformulated as a binary in...

متن کامل

Two echelon-two indenture extended warranty distribution network under imperfect preventive maintenance policies

Nowadays, offering extended warranty is considered as a lucrative source of income from the perspective of the after-sale service providers. Meanwhile, the main concern is presence or absence of base warranty and strategies adopted by the manufacturer during this period. Moreover, extended warranty structure must be responsive and customer oriented, which not only control the services cost but ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Mathematical Problems in Engineering

سال: 2015

ISSN: 1024-123X,1563-5147

DOI: 10.1155/2015/728241