Models and an exact method for the Unrelated Parallel Machine scheduling problem with setups and resources

نویسندگان

چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Finite Horizon Economic Lot and Delivery Scheduling Problem: Flexible Flow Lines with Unrelated Parallel Machines and Sequence Dependent Setups

This paper considers the economic lot and delivery scheduling problem in a two-echelon supply chains, where a single supplier produces multiple components on a flexible flow line (FFL) and delivers them directly to an assembly facility (AF). The objective is to determine a cyclic schedule that minimizes the sum of transportation, setup and inventory holding costs per unit time without shortage....

متن کامل

Decomposition Methods for the Parallel Machine Scheduling Problem with Setups

We study the unrelated parallel machine scheduling problem with sequence and machine dependent setup times and the objective of makespan minimization. Two exact decomposition-based methods are proposed based on logic-based Benders decomposition and branch-and-check. These approaches are hybrid models that make use of a mixed integer programming master problem and a specialized solver for travel...

متن کامل

A Novel B and B Algorithm for a Unrelated Parallel Machine Scheduling Problem to Minimize the Total Weighted Tardiness

This paper presents a scheduling problem with unrelated parallel machines and sequencedependent setup times that minimizes the total weighted tardiness. A new branch-and-bound (B and B) algorithm is designed incorporating the lower and upper bounding schemes and several dominance properties. The lower and upper bounds are derived through an assignment problem and the composite dispatching rule ...

متن کامل

A scheduling problem with unrelated parallel machines and sequence dependent setups

This paper addresses a scheduling problem with unrelated parallel machines, sequence dependent setups and due dates. The problem is based on a real case and the objective is to minimise the sum of the makespan and the weighted delays. A mixed integer linear programming model is proposed and since the model considers realistic constraints, a metaheuristic based on GRASP is used as a solution met...

متن کامل

An Exact Algorithm for the Mode Identity Project Scheduling Problem

In this paper we consider the non-preemptive variant of a multi-mode resource constrained project scheduling problem (MRCPSP) with mode identity, in which a set of project activities is partitioned into disjoint subsets while all activities forming one subset have to be processed in the same mode. We present a depth-first branch and bound algorithm for the resource constrained project schedulin...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Expert Systems with Applications: X

سال: 2020

ISSN: 2590-1885

DOI: 10.1016/j.eswax.2020.100022