Modified NSGA-II for a Bi-Objective Job Sequencing Problem
نویسندگان
چکیده
منابع مشابه
Developing a bi-objective optimization model for solving the availability allocation problem in repairable series–parallel systems by NSGA II
Bi-objective optimization of the availability allocation problem in a series–parallel system with repairable components is aimed in this paper. The two objectives of the problem are the availability of the system and the total cost of the system. Regarding the previous studies in series–parallel systems, the main contribution of this study is to expand the redundancy allocation problems to syst...
متن کاملSolving a bi-objective location routing problem by a NSGA-II combined with clustering approach: application in waste collection problem
It is observed that the separated design of location for depots and routing for servicing customers often reach a suboptimal solution. So, solving location and routing problem simultaneously could achieve better results. In this paper, waste collection problem is considered with regard to economic and societal objective functions. A non-dominated sorting genetic algorithm (NSGA-II) is used to l...
متن کاملA modified NSGA-II solution for a new multi-objective hub maximal covering problem under uncertain shipments
Hubs are centers for collection, rearrangement, and redistribution of commodities in transportation networks. In this paper, non-linear multi-objective formulations for single and multiple allocation hub maximal covering problems as well as the linearized versions are proposed. The formulations substantially mitigate complexity of the existing models due to the fewer number of constraints and v...
متن کاملA mathematical multi-objective model for treatment network design (physical-biological-thermal) using modified NSGA II
Today, sustainable development is one of the important issues in regard to the economy of a country. This issue magnifies the necessity for increased scrutiny towards issues such as environmental considerations and product recovery in closed-loop supply chains (CLSCs). The most important motivational factors influencing research on these topics can be considered in two general groups: environme...
متن کاملOptimizing a bi-objective preemptive multi-mode resource constrained project scheduling problem: NSGA-II and MOICA algorithms
The aim of a multi-mode resource-constrained project scheduling problem (MRCPSP) is to assign resource(s) with the restricted capacity to an execution mode of activities by considering relationship constraints, to achieve pre-determined objective(s). These goals vary with managers or decision makers of any organization who should determine suitable objective(s) considering organization strategi...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Intelligent Information Management
سال: 2012
ISSN: 2160-5912,2160-5920
DOI: 10.4236/iim.2012.46036