MONITORING AND CONTROL SYSTEM OF THE STAKEHOLDERS ACTIVITIES FOR PROJECT BASED ON THE EARNED DURATION MANAGEMENT METHOD

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An ex ante control chart for project monitoring using earned duration management observations

In the past few years, there has been an increasing interest in developing project control systems. The primary purpose of such systems is to indicate whether the actual performance is consistent with the baseline and to produce a signal in the case of non-compliance. Recently, researchers have shown an increased interest in monitoring project’s performance indicators, by plotting them on the S...

متن کامل

Self-Starting Control Chart and Post Signal Diagnostics for Monitoring Project Earned Value Management Indices

Earned value management (EVM) is a well-known approach in a project control system which uses some indices to track schedule and cost performance of a project. In this paper, a new statistical framework based on self-starting monitoring and change point estimation is proposed to monitor correlated EVM indices which are usually auto-correlated over time and non-normally distributed. Also, a new ...

متن کامل

developing a pattern based on speech acts and language functions for developing materials for the course “ the study of islamic texts translation”

هدف پژوهش حاضر ارائه ی الگویی بر اساس کنش گفتار و کارکرد زبان برای تدوین مطالب درس "بررسی آثار ترجمه شده ی اسلامی" می باشد. در الگوی جدید، جهت تدوین مطالب بهتر و جذاب تر، بر خلاف کتاب-های موجود، از مدل های سطوح گفتارِ آستین (1962)، گروه بندی عملکردهای گفتارِ سرل (1976) و کارکرد زبانیِ هالیدی (1978) بهره جسته شده است. برای این منظور، 57 آیه ی شریفه، به صورت تصادفی از بخش-های مختلف قرآن انتخاب گردید...

15 صفحه اول

forecasting project duration by earned duration management and risk management

being observed frequently that projects cannot achieve to their plan duration and their budget. utilizing retrospective method is one of the reasons for this problem. in this research two method, earned duration management and risk management, has been used to remove the gap of the plan and the reality; this enable the project to utilize both high accuracy of the first method and prophecy of th...

متن کامل

the effects of cooperative versus individual directed reading thinking activities on students inferential and referential questions

two groups of students were assigned as experimental and control ones, and were given instruction on directed reading-thinking activities and after some treatment, they were post-tested. although the initial pre-test did not show any significant differences, the final post-test result revealed that the cooperative reading comprehension helped the experimental group. the cooperative students’...

15 صفحه اول

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: MIR (Modernization. Innovation. Research)

سال: 2018

ISSN: 2411-796X,2079-4665

DOI: 10.18184/2079-4665.2018.9.1.86-97