Monitoring groundwater flow using the electrical method at a rock-fill dam during first filling

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Seepage Control in a High Concrete Face-Rock Fill Dam Based on the Node Virtual Flow Method

Abstract: The seepage control system of a high Concrete Face Rock-Fill Dam (CFRD) may have anti-seepage deficiencies during both construction and operation. In order to solve these, the three-dimensional Finite Element Method (FEM) model was built based on dam body filling, anti-seepage system, defect location and bedrock distribution. The seepage field simulation and computation were carried o...

متن کامل

COMPUTER SIMULATION OF FLUID FLOW FILLING DURING MOLD USING FINITE VOLUME METHOD

In this investigation, ^5 2-D Finite Volume Method (FVM) with unstructured triangular mesh is developed to simulate the mould filling process. The simulation of fluid flow and track of free surface is based on the Marker And Cell (MAC) technique. This technique has capability ofhandling the arbitrary curved solid boundaries in the casting processes. In order to verify the computational results ...

متن کامل

Simulating Groundwater Flow in Fractured Porous Rock Formations Using the Analytic Element Method

Ivan S. P. Marin∗, Edson Wendland∗ and Otto D. L. Strack† ∗Universidade de São Paulo Hydraulics and Sanitation Department, Engineering School of São Carlos Av. Trabalhador Sãocarlense, 400 CP 359 São Carlos, SP CEP 13566-590 Brazil e-mail: [email protected], web page: http://albatroz.shs.eesc.usp.br/ † Department of Civil Engineering, University of Minnesota 500 Pillsbury Drive SE, Minneapolis M...

متن کامل

Monitoring of Cheragh-veis Dam During Construction Using Instrumentation Data and Investigation of dam behavior during impounding

One of the most important challenges in development projects beside designing and performing them is to control immunity and stability of the several parts during different stages of construction, impoundment, and operation.  The   main purpose of instrumentation in dams is to evaluate operation and reaction of these structures under different load conditions, developing a better understanding...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: BUTSURI-TANSA(Geophysical Exploration)

سال: 2015

ISSN: 0912-7984,1881-4824

DOI: 10.3124/segj.68.189