MRP Systems Considering Fuzzy Capacity, Lead Times and Inventory Availability
نویسندگان
چکیده
منابع مشابه
Integrated capacity and inventory management with capacity acquisition lead times
In this paper we consider a make-to-stock production system whose permanent production capacity can be increased temporarily by making use of some contingent resources, while this capacity acquisition has a constant lead time associated with it. We present a model where the capacity management problem is handled in an integrated manner with the inventory management, under non-stationary and sto...
متن کاملA fuzzy approach to capacity constrained MRP systems
J. Mula CIGIP (Research Centre on Production Management and Engineering) Polytechnic University of Valencia Plaza Ferrándiz y Carbonell, 2 03801 Alcoy (Alicante) [email protected] R. Poler CIGIP (Research Centre on Production Management and Engineering) Polytechnic University of Valencia Plaza Ferrándiz y Carbonell, 2 03801 Alcoy (Alicante) [email protected] J.P. García-Sabater CIGIP (Resear...
متن کاملSpare Parts Inventory Management with Demand Lead–Times and Rationing
We study an inventory system that consists of two demand classes. The orders in the first class need to be satisfied immediately, whereas the orders in the second class are to be filled in a given demand lead–time. The two classes are also of different criticality. For this system, we propose a policy that rations the non–critical orders. Under a one-for-one replenishment policy with backorderi...
متن کاملMaterial Requirement Planning under Fuzzy Lead Times
This paper proposes a fuzzy multi-objective integer linear programming approach to model a material requirement planning (MRP) problem with fuzzy lead times. We incorporate to the crisp MRP model the possibility of occurrence of each one of the possible lead times. Then, an objective function that maximizes the possibility of occurrence of the lead times is considered. By combining this objecti...
متن کاملOptimization of (s, S) Inventory Systems with Random Lead Times and a Service Level Constraint
A major assumption in the analysis of (s, S) inventory systems with stochastic lead times is that orders are received in the same sequence as they are placed. Even under this assumption, much of the work to date has focused on the unconstrained optimization of the system, in which a penalty cost for unsatisfied demand is assigned. The literature on constrained optimization, wherein a service le...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: International Journal of Simulation Modelling
سال: 2021
ISSN: 1726-4529
DOI: 10.2507/ijsimm20-1-538