Multi-agent scheduling on a single machine with max-form criteria
نویسندگان
چکیده
منابع مشابه
Multi-agent scheduling on a single machine with max-form criteria
We consider multi-agent scheduling on a single machine, where the objective functions of the agents are of the max-form. For the feasibility model, we show that the problem can be solved in polynomial time even when the jobs are subject to precedence restrictions. For the minimality model, we show that the problem is strongly NP-hard in general, but can be solved in pseudo-polynomial time when ...
متن کاملMulti-agent single machine scheduling
We consider the scheduling problems arising when several agents, each owning a set of nonpreemptive jobs, compete to perform their respective jobs on one shared processing resource. Each agent wants to minimize a certain cost function, which depends on the completion times of its jobs only. The cost functions we consider in this paper are maximum of regular functions (associated with each job),...
متن کاملA Mathematical Model of a Multi-Criteria Parallel Machine Scheduling Problem: a Genetic Algorithm (RESEARCH NOTE)
.
متن کاملOptimum Aggregate Inventory for Scheduling Multi-product Single Machine System with Zero Setup Time
In this paper we adopt the common cycle approach to economic lot scheduling problem and minimize the maximum aggregate inventory. We allow the occurrence of the idle times between any two consecutive products and consider limited capital for investment in inventory. We assume the setup times are negligible. To achieve the optimal investment in inventory we first find the idle times which minimi...
متن کاملA Mathematical Programming Model and Genetic Algorithm for a Multi-Product Single Machine Scheduling Problem with Rework Processes
In this paper, a multi-product single machine scheduling problem with the possibility of producing defected jobs, is considered. We concern rework in the scheduling environment and propose a mixed-integer programming (MIP) model for the problem. Based on the philosophy of just-in-time production, minimization of the sum of earliness and tardiness costs is taken into account as the objective fu...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: European Journal of Operational Research
سال: 2008
ISSN: 0377-2217
DOI: 10.1016/j.ejor.2007.04.040