Multi-objective Job Shop Scheduling Using Pre-emptive Constraint Procedure
نویسندگان
چکیده
منابع مشابه
Solving Flexible Job Shop Scheduling with Multi Objective Approach
In this paper flexible job-shop scheduling problem (FJSP) is studied in the case of optimizing different contradictory objectives consisting of: (1) minimizing makespan, (2) minimizing total workload, and (3) minimizing workload of the most loaded machine. As the problem belongs to the class of NP-Hard problems, a new hybrid genetic algorithm is proposed to obtain a large set of Pareto-optima...
متن کاملAn algorithm for multi-objective job shop scheduling problem
Scheduling for job shop is very important in both fields of production management and combinatorial op-timization. However, it is quite difficult to achieve an optimal solution to this problem with traditional opti-mization approaches owing to the high computational complexity. The combination of several optimization criteria induces additional complexity and new problems. In this paper, we pro...
متن کاملA New Multi-objective Job Shop Scheduling with Setup Times Using a Hybrid Genetic Algorithm
This paper presents a new multi objective job shop scheduling with sequence-dependent setup times. The objectives are to minimize the makespan and sum of the earliness and tardiness of jobs in a time window. A mixed integer programming model is developed for the given problem that belongs to NP-hard class. In this case, traditional approaches cannot reach to an optimal solution in a reasonable...
متن کاملan algorithm for multi-objective job shop scheduling problem
scheduling for job shop is very important in both fields of production management and combinatorial op-timization. however, it is quite difficult to achieve an optimal solution to this problem with traditional opti-mization approaches owing to the high computational complexity. the combination of several optimization criteria induces additional complexity and new problems. in this paper, we pro...
متن کاملMulti-Objective Flexible Job Shop Scheduling Optimization Models (II)
For the Multi-Objective Flexible Job Shop Scheduling Problems (MOFJSSP), various optimization models have been designed. In the first part of the research (published in no. 2/2012) we presented the multi-sort production systems, the theoretical aspects of MOFJSSP framework, a specific real JSS process in drugs industry based on over 600 tasks to be optimally scheduled (used as a case study for ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: American Journal of Modeling and Optimization
سال: 2019
ISSN: 2333-1143
DOI: 10.12691/ajmo-7-1-2