Multi-Objective Physician Scheduling using Non-Dominated Sorting Native Binary Particle Swarm Optimization with Deallocation Method

نویسندگان

چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Multi-objective bidding strategy for GenCo using non-dominated sorting particle swarm optimisation

This paper proposes a multi-objective bidding strategy for a generation company (GenCo) in a day-ahead uniform price spot market using non-dominated sorting particle swarm optimisation (NSPSO). NSPSO is introduced to solve the multi-objective strategic bidding problem considering expected profit maximisation and risk (profit variation) minimisation. Monte Carlo (MC) simulation is employed to si...

متن کامل

A Non-dominated Sorting Particle Swarm Optimizer for Multiobjective Optimization

This paper introduces a modified PSO, Non-dominated Sorting Particle Swarm Optimizer (NSPSO), for better multiobjective optimization. NSPSO extends the basic form of PSO by making a better use of particles’ personal bests and offspring for more effective nondomination comparisons. Instead of a single comparison between a particle’s personal best and its offspring, NSPSO compares all particles’ ...

متن کامل

Solution of Multi-Objective optimal reactive power dispatch using pareto optimality particle swarm optimization method

For multi-objective optimal reactive power dispatch (MORPD), a new approach is proposed where simultaneous minimization of the active power transmission loss, the bus voltage deviation and the voltage stability index of a power system are achieved. Optimal settings of continuous and discrete control variables (e.g. generator voltages, tap positions of tap changing transformers and the number of...

متن کامل

Multi-objective optimization of discrete time–cost tradeoff problem in project networks using non-dominated sorting genetic algorithm

The time–cost tradeoff problem is one of the most important and applicable problems in project scheduling area. There are many factors that force the mangers to crash the time. This factor could be early utilization, early commissioning and operation, improving the project cash flow, avoiding unfavorable weather conditions, compensating the delays, and so on. Since there is a need to allocate e...

متن کامل

Using Multi-Objective Particle Swarm Optimization for Bi-objective Multi-Mode Resource-Constrained Project Scheduling Problem

In this paper the multi-mode resource-constrained project scheduling problem with discounted cash flows is considered. Minimizing the makespan and maximization the net present value (NPV) are the two common objectives that have been investigated in the literature. We apply one evolutionary algorithm named multiobjective particle swarm optimization (MOPSO) to find Pareto front solutions. We used...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Emerging Trends in Engineering Research

سال: 2020

ISSN: 2347-3983

DOI: 10.30534/ijeter/2020/87882020