MULTI-OBJECTIVE SYMBIOTIC ORGANISMS OPTIMIZATION FOR MAKING TIME-COST TRADEOFFS IN REPETITIVE PROJECT SCHEDULING PROBLEM
نویسندگان
چکیده
منابع مشابه
A multi-objective resource-constrained optimization of time-cost trade-off problems in scheduling project
This paper presents a multi-objective resource-constrained project scheduling problem with positive and negative cash flows. The net present value (NPV) maximization and making span minimization are this study objectives. And since this problem is considered as complex optimization in NP-Hard context, we present a mathematical model for the given problem and solve three evolutionary algorithms;...
متن کاملa multi-objective resource-constrained optimization of time-cost trade-off problems in scheduling project
this paper presents a multi-objective resource-constrained project scheduling problem with positive and negative cash flows. the net present value (npv) maximization and making span minimization are this study objectives. and since this problem is considered as complex optimization in np-hard context, we present a mathematical model for the given problem and solve three evolutionary algorithms;...
متن کاملA Multi-objective optimization model for project scheduling with time-varying resource requirements and capacities
Proper and realistic scheduling is an important factor of success for every project. In reality, project scheduling often involves several objectives that must be realized simultaneously, and faces numerous uncertainties that may undermine the integrity of the devised schedule. Thus, the manner of dealing with such uncertainties is of particular importance for effective planning. A realistic sc...
متن کاملMulti-objective optimization of discrete time–cost tradeoff problem in project networks using non-dominated sorting genetic algorithm
The time–cost tradeoff problem is one of the most important and applicable problems in project scheduling area. There are many factors that force the mangers to crash the time. This factor could be early utilization, early commissioning and operation, improving the project cash flow, avoiding unfavorable weather conditions, compensating the delays, and so on. Since there is a need to allocate e...
متن کاملOptimization of an energy based bi-objective multi skilled resource investment project scheduling problem
Growing concern in the management of energy due to the increasing energy costs, has forced managers to optimize the amount of energy required to provide products and services. This research integrates an energy-based resource investment project-scheduling problem (RIP) under a multi-skilled structure of the resources. The proposed energy based multi skilled resource investment problem (EB-MSRIP...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT
سال: 2019
ISSN: 1392-3730,1822-3605
DOI: 10.3846/jcem.2019.9681