Multi products single machine EPQ model with immediate rework process

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Multiproduct EPQ Model with Single Machine , Backordering , and Immediate Rework Process

Production systems with scrapped and rework items have recently become an interesting subject of research. While most attempts have been focused on finding the optimal production quantity in a simple production system, little work appears on a joint production environment. In this research, two joint production systems in a form of multiproduct singlemachine with and without rework are studied ...

متن کامل

A deterministic multi product single machine EPQ model with backordering, scraped products, rework and interruption in manufacturing process

In this paper, an economic production quantity (EPQ) inventory model with interruption in process, scrap and rework is developed and analyzed. The inventory model is for multiple products and all products are manufactured in a unique machine. Obviously, the existence of only one machine results in limited production capacity and shortages. Therefore, shortages are permitted and fully backordere...

متن کامل

Environmentally Responsible EPQ Model with Rework Process of Defective Items

A real economic growth only comes from increasing quality and quantity of the factors of production. Most production systems produce items which are of imperfect quality. In a production/inventory situation items which are received or produced are not of perfect quality. Thus the presence of defects which is inevitable in a produced/ordered lot is sorted out by the process of screening. Handlin...

متن کامل

A Mathematical Programming Model and Genetic Algorithm for a Multi-Product Single Machine Scheduling Problem with Rework Processes

In this paper, a multi-product single machine scheduling problem with the possibility of producing defected jobs, is considered. We concern rework in the scheduling environment and propose a mixed-integer programming (MIP) model for the problem.  Based on the philosophy of just-in-time production, minimization of the sum of earliness and tardiness costs is taken into account as the objective fu...

متن کامل

Solving an Epq Model with Rework and Service Level Constraint

This paper examines an economic production quantity (EPQ) model with rework and service level constraint. First, we prove that the expected overall costs for an imperfect EPQ model with backlogging permitted is less than or equal to that of the one without backlogging. Secondly, the relationship between “imputed backorder cost” and maximal shortage level is derived for decision-making on whethe...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: international journal of industrial engineering computations

سال: 2012

ISSN: 1923-2926,1923-2934

DOI: 10.5267/j.ijiec.2011.09.001