Multi-site production planning in hybrid make-to-stock/make-to-order production environment

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Batch-wise ATP Procedure in Hybrid Make-to-Order/Make-to-Stock Manufacturing Environment

Satisfying customer demand necessitates manufacturers understanding the importance of Available-To-Promise (ATP). It directly links available resources to customer orders and has significant impact on overall performance of a supply chain. In this paper, an improvement of the batch-mode ATP function in which the partial fulfillment of the orders is available will be proposed. In other words, in...

متن کامل

A Simulation-Optimization Model For Capacity Coordination In Make To Stock/Make To Order Production Environments

Capacity coordination, as the tactical level of hierarchical production planning in hybrid MTS/MTO systems, includes numerous important decisions. In this paper, two of these decisions i.e. finding the best strategy for the acceptance/rejection of incoming orders and determining orders’ due dates – are investigated. Also a simulation model is proposed to evaluate the efficiency of the presented...

متن کامل

Collaborative production planning with production time windows and order splitting in make-to-order manufacturing

In this paper, we study a generalized production planning problem, that simultaneously investigates the two decisions that play critical roles in most firms, namely, production planning and order splitting and assignment. The problem takes into consideration the production time windows and capacities. We formulate the integrated problem as a linear mixed-integer program with a minimized total c...

متن کامل

Project-oriented Approach to Production Planning and Scheduling in Make-to-order Manufacturing

In this paper, we present a unified framework for production planning and scheduling in make-to-order manufacturing. Both planning and scheduling problems are captured as resource-constrained project scheduling problems. The actual models and solution techniques are different at the two levels. Hence, we also suggest an aggregation method that provides the connection between planning and schedu...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Industrial Engineering International

سال: 2014

ISSN: 1735-5702,2251-712X

DOI: 10.1007/s40092-014-0060-z