Multiple Exchanges of Job Orders for No-Buffer Job Shop Scheduling Problem

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A column generation heuristic for complex job shop multiple orders per job scheduling

Scheduling in semiconductor manufacturing is a challenging task due to inherent complexities like assignment of multiple customer orders to front opening unified pods (FOUPs), batch processing in multiple toolgroups with parallel machines, and re-entrant flow. A disjunctive–network-flow mixed integer program (DNF) and a column generation heuristic are presented to minimize the sum of weighted c...

متن کامل

An algorithm for multi-objective job shop scheduling problem

Scheduling for job shop is very important in both fields of production management and combinatorial op-timization. However, it is quite difficult to achieve an optimal solution to this problem with traditional opti-mization approaches owing to the high computational complexity. The combination of several optimization criteria induces additional complexity and new problems. In this paper, we pro...

متن کامل

The Job-shop Scheduling Problem the Job-shop Scheduling Problem with Setup Times

This paper reports a bibliographical study and some personnal works about the general Jobshop Problem and Jobshop Problems with setup times. Section 1 introduces some { usual { notations about the general problem. Speciic notations concerning with setup times will be introduced later. The bibliograacal study, in Section 2 focuses on recent papers on both problems. Section 3 presents a general s...

متن کامل

A coordinated scheduling system for customer orders scheduling problem in job shop environments

In this study a coordinated scheduling of customer orders (CSCO) system, with the purpose of improving customer order flow time, is proposed for the order-based production system in which several jobs make up a given customer order and nothing is delivered to the customer until the order is complete. The customer order flow time, which elapses between the release of the first job and the comple...

متن کامل

The single machine multiple orders per job scheduling problem

The standard unit of transfer in new semiconductor wafer fabrication facilities is the front opening unified pod (FOUP). Due to automated material handling system and cost concerns, the number of FOUPs in a wafer fab is kept limited. Large 300-mm wafers allow for customer orders to be filled with less than a full FOUP of wafers in these new fabs, thereby making grouping orders from multiple cus...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Advanced Mechanical Design, Systems, and Manufacturing

سال: 2012

ISSN: 1881-3054

DOI: 10.1299/jamdsm.6.661