Multiple Shift Scheduling of Hierarchical Workforce with Multiple Work Centers
نویسندگان
چکیده
منابع مشابه
Multiple Shift Scheduling of Hierarchical Workforce with Multiple Work Centers
This paper is concerned with an employee scheduling problem involving multiple shifts and work centers, where employees belong to a hierarchy of categories having downward substitutability. An employee at a higher category may perform the duties of an employee at a lower category, but not vice versa. However, a higher category employee receives a higher compensation than a lower category employ...
متن کاملDetailed Scheduling of Tree-like Pipeline Networks with Multiple Refineries
In the oil supply chain, the refined petroleum products are transported by various transportation modes, such as rail, road, vessel and pipeline. The latter provides one of the safest and cheapest ways to connect production areas to local markets. This paper addresses the operational scheduling of a multi-product tree-like pipeline connecting several refineries to multiple distribution centers ...
متن کاملImplicit shift scheduling with multiple breaks and work stretch duration restrictions
This paper considers a shift scheduling problem that includes different forms of flexibility in terms of shift starting times, break lengths and break placement. Two particular forms are studied: fractionable breaks and work stretch duration restrictions. For some instances the use of fractionable breaks results in considerable labor savings. In addition, imposing work stretch duration restrict...
متن کاملNear - Data Scheduling for Data Centers with Multiple
Data locality is a fundamental issue for data-parallel applications. Considering MapReduce in Hadoop, the map task scheduling part requires an efficient algorithm which takes data locality into consideration; otherwise, the system may become unstable under loads inside the system’s capacity region and jobs may experience longer completion times which are not of interest. The data chunk needed f...
متن کاملShift-scheduling of Call Centers with Uncertain Arrival Parameters
This paper considers a multi-periodic multi-shift call center staffing problem with two types of jobs: calls and emails. The arrival rate of calls is random and the workforce presents some flexibility: the agents can be affected to one job type in real-time. At each period of the day, a service quality constraint limits the waiting time for a call. The staffing problem is modeled as a newsboy-t...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Informatica
سال: 2007
ISSN: 0868-4952,1822-8844
DOI: 10.15388/informatica.2007.180