Multistage Adaptive Optimization for Steelmaking and Continuous Casting Scheduling under Processing Time Uncertainty

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A mathematical programming model for scheduling steelmaking-continuous casting production

This paper presents a mathematical model, based on the just-in-time (JIT) idea, for solving machine con ̄icts in steelmaking-continuous casting (SCC) production scheduling in the computer integrated manufacturing system (CIMS) environment. The model is developed as a non-linear model based on actual production situations, considering both punctual delivery and production operation continuity. It...

متن کامل

A Data-Driven Multistage Adaptive Robust Optimization Framework for Planning and Scheduling under Uncertainty

A novel data-driven approach for optimization under uncertainty based on multistage adaptive robust optimization (ARO) and nonparametric kernel density M-estimation is proposed. Different from conventional robust optimization methods, the proposed framework incorporates distributional information to avoid over-conservatism. Robust kernel density estimation with Hampel loss function is employed ...

متن کامل

Simulating Schedule Optimization Problem in Steelmaking Continuous Casting Process

This paper establishes the models of the steelmaking continuous casting (SCC) process, and proposed the improved algorithms for this problem. The simulation results of a computerized scheduling system are also given to prove the model. The SCC process scheduling problem is very difficult to get a good performance solution in practice. The scheduling of the SCC process requires that each cast pl...

متن کامل

Robust Optimization for Scheduling under Bounded Uncertainty in Processing Times

A novel robust optimization methodology is proposed for scheduling under bounded uncertainty in processing times. This approach generates “robust” solutions which are in a sense immune against uncertainty when it is applied to Mixed-Integer Linear Programming (MILP) problems with uncertain coefficients and right-hand-side parameters of the inequality constraints. By introducing a small number o...

متن کامل

A Hybrid Modeling for Continuous Casting Scheduling Problem

This paper deals with a multi-agent-based interval type-2 fuzzy (IT2F) expert systemfor scheduling steel continuous casting. Continuous caster scheduling is a complex and extensiveprocess that needs expert staff. In this study, a distributed multi-agent-based structure is proposed as asolution. The agents used herein can cooperate with each other via various communication protocols.To facilitat...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IFAC-PapersOnLine

سال: 2018

ISSN: 2405-8963

DOI: 10.1016/j.ifacol.2018.09.429