Nash equilibrium solutions in multi-agent project scheduling with milestones

نویسندگان

چکیده

This paper addresses a project scheduling environment in which the activities are partitioned among set of agents. The owner is interested completing as soon possible. Therefore, she/he defines rewards and penalties to stimulate agents complete faster. offers per-day reward for early completion intermediate milestones be met within specific due dates, with associated penalties. Each agent can, therefore, decide duration her/his activities, taking into account linear activity crashing costs, completion, penalty arising from violating milestone due-dates. We consider Nash equilibria, i.e., situations no has an interest individually changing any particular, problem finding minimum-makespan equilibrium. known NP-hard, this paper, we (i) propose new efficient exact algorithmic approach equilibrium (ii) through extensive computational campaign evaluate role played by driving towards owner’s goal.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Finding an optimal Nash equilibrium to the multi-agent project scheduling problem

multi-agent project scheduling problem Cyril Briand , Sandra Ulrich Ngueveu and Přemysl Š̊ucha (1) CNRS ; LAAS ; 7 avenue du colonel Roche, F-31077 Toulouse Cedex 4, France, (2) Université de Toulouse ; UPS, INP; LAAS; F-31077 Toulouse Cedex 4, France (3) Czech Technical University in Prague; Faculty of Electrical Engineering; Karlovo namesti 13, 121 35, Prague 2, Czech Republic Emails: {briand,...

متن کامل

Nash equilibria for the multi-agent project scheduling problem with controllable processing times

This paper considers a project scheduling environment in which the activities of the project network are partitioned among a set of agents. Activity durations are controllable, i.e., every agent is allowed to shorten the duration of its activities, incurring a crashing cost. If the project makespan is reduced with respect to its normal value, a reward is offered to the agents and each agent rec...

متن کامل

Project Scheduling Based on Multi-Agent Systems

One of the most important and challenging issues in construction project management is to schedule activities to meet the construction project requirements under resource constraints. In this paper, we will concentrate on the development of a workflow scheduling system that can be applied in construction supply chains based on the interactions of entities/partners. Execution of workflows that h...

متن کامل

An Optimal NPV Project Scheduling with Fixed Work Content and Payment on Milestones

    Project scheduling   Net present value   We consider a project scheduling problem with permitted tardiness and discrete time/resource trade-offs under maximum net present value objective. In this problem, a project consists of a set of sequential phases such that each phase contains one or more sub-projects including activities interrelated by finish-start-type precedence relations with a t...

متن کامل

The Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem

This paper presents the formulation and solution of the Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem. The focus of the proposed method is not on finding a single optimal solution, instead on presenting multiple feasible solutions, with cost and duration information to the project manager. The motivation for developing such an approach is due in part to practica...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: European Journal of Operational Research

سال: 2021

ISSN: ['1872-6860', '0377-2217']

DOI: https://doi.org/10.1016/j.ejor.2021.01.023