No More Suffering: Building Human Resource Capacities with the Sphere Standard

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Building a robust sentiment lexicon with (almost) no resource

Creating sentiment polarity lexicons is labor intensive. Automatically translating them from resourceful languages requires in-domain machine translation systems, which rely on large quantities of bi-texts. In this paper, we propose to replace machine translation by transferring words from the lexicon through word embeddings aligned across languages with a simple linear transform. The approach ...

متن کامل

Building Capacities in Human Language Technology for African Languages

The development of Human Language Technology (HLT) is one of the important by-products of the information revolution. However, the level of knowledge and skills in HLT for African languages remain unfortunately low as most scholars continue to work within the frameworks of knowledge production for an industrial society while the information age dawns. This paper reports the work of African Lang...

متن کامل

Building Collaborative Capacities in Learners

In this paper we trace the evolution of a project using a wiki-based learning environment in a tertiary education setting. The project has the pedagogical goal of building learners’ capacities to work effectively in the networked, collaborative, creative environments of the knowledge economy. The paper explores the four key characteristics of a ‘produsage’ environment and identifies four strate...

متن کامل

Epidural technique for postoperative pain: gold standard no more?

Epidural analgesia is a well-established technique that has commonly been regarded as the gold standard in postoperative pain management. However, newer, evidence-based outcome data show that the benefits of epidural analgesia are not as significant as previously believed. There are some benefits in a decrease in the incidence of cardiovascular and pulmonary complications, but these benefits ar...

متن کامل

A Multi-objective optimization model for project scheduling with time-varying resource requirements and capacities

Proper and realistic scheduling is an important factor of success for every project. In reality, project scheduling often involves several objectives that must be realized simultaneously, and faces numerous uncertainties that may undermine the integrity of the devised schedule. Thus, the manner of dealing with such uncertainties is of particular importance for effective planning. A realistic sc...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Prehospital and Disaster Medicine

سال: 2019

ISSN: 1049-023X,1945-1938

DOI: 10.1017/s1049023x19003431