NSLS control system upgrade
نویسندگان
چکیده
منابع مشابه
Nsls Control System Interface to Modicon Plc
The hardware engineering efforts at the National Synchrotron Light Source facility are currently geared towards the use of programmable logic controllers (PLCs) for the control of machine hardware. The PLC provides a cost-effective solution combined with easy maintenance and upgrade. Modicon control products from Schneider Automation Inc. have been chosen since a wide range of PLC’s, inexpensiv...
متن کاملUpgrade of the Sdl Control System
The Source Development Lab (SDL) at BNL consists of a 230 MeV electron linac and a 10 m long wiggler for short wavelength Free Electronic Laser (FEL) development. The original control system [1] was based on the one in use at the National Synchrotron Light Source. In 2000 the control system was upgraded to be based on EPICS to facilitate software interfaces for extensions at all levels. The FEL...
متن کاملBnl Accelerator Test Facility Control System Upgrade
Brookhaven National Laboratory’s Accelerator Test Facility (ATF) has embarked on a complete upgrade of its decade old computer system. The planned improvements affect every major component: processors (Intel Pentium replaces VAXes), operating system (Linux/Real-Time Linux supplants OpenVMS), and data acquisition equipment (fast Ethernet equipment replaces CAMAC serial highway.) This paper summa...
متن کاملThe Aps Control System Network Upgrade*
When it was installed, the Advanced Photon Source (APS) control system network was at the state-of-the-art. Different aspects of the system have been reported at previous meetings [1,2]. As loads on the controls network have increased due to newer and faster workstations and front-end computers, we have found performance of the system declining and have implemented an upgraded network. There ha...
متن کاملUpgrade of Control System for the BEPCII
The BEPC will increase its luminosity ten times with upgrade of both the machine and detector, which is the project BEPCII. The project will be started at beginning of 2002 and finished within 3-4 years. In order to reach the goal of the BEPCII, a number of new equipment will be added in the system, such as the superconducting RF cavities, new magnet power supplies and beam feedback system, and...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Nuclear Instruments and Methods in Physics Research Section A: Accelerators, Spectrometers, Detectors and Associated Equipment
سال: 1994
ISSN: 0168-9002
DOI: 10.1016/0168-9002(94)91475-3