On optimizing a bi-objective flowshop scheduling problem in an uncertain environment

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

a bi-objective model for a flowshop scheduling problem with availability constraint of machines

this paper presents a new bi-objective mathematical model for a permutation flowshop scheduling problem with availability constraint in case of preventive maintenance operations on machines. in this paper, preventive maintenance is flexible and there is not a certain time for the maintenance operation; however, time between two consecutive maintenance operations for each machine should not be g...

متن کامل

A HYBRID GENETIC ALGORITHM FOR A BI-OBJECTIVE SCHEDULING PROBLEM IN A FLEXIBLE MANUFACTURING CELL

 This paper considers a bi-objective scheduling problem in a flexible manufacturing cell (FMC) which minimizes the maximum completion time (i.e., makespan) and maximum tardiness simultaneously. A new mathematical model is considered to reflect all aspect of the manufacturing cell. This type of scheduling problem is known to be NP-hard. To cope with the complexity of such a hard problem, a genet...

متن کامل

Bi-objective scheduling on parallel machines with uncertain processing time

In this paper we consider bi-criteria scheduling problem on parallel machines which optimizes the number of tardy jobs with the condition of primary criterion of Tmax remains optimized. The processing times of jobs are uncertain that is not known exactly and only estimated values are given. This leads to the use of fuzzy numbers for representing these imprecise values. Here, we use triangular f...

متن کامل

Optimizing a bi-objective preemptive multi-mode resource constrained project scheduling problem: NSGA-II and MOICA algorithms

The aim of a multi-mode resource-constrained project scheduling problem (MRCPSP) is to assign resource(s) with the restricted capacity to an execution mode of activities by considering relationship constraints, to achieve pre-determined objective(s). These goals vary with managers or decision makers of any organization who should determine suitable objective(s) considering organization strategi...

متن کامل

A Novel Adapted Multi-objective Meta-heuristic Algorithm for a Flexible Bi-objective Scheduling Problem Based on Physics Theory

  We relax some assumptions of the traditional scheduling problem and suggest an adapted meta-heuristic algorithm to optimize efficient utilization of resources and quick response to demands simultaneously. We intend to bridge the existing gap between theory and real industrial scheduling assumptions (e.g., hot metal rolling industry, chemical and pharmaceutical industries). We adapt and evalua...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Computers & Mathematics with Applications

سال: 2012

ISSN: 0898-1221

DOI: 10.1016/j.camwa.2012.02.051