On project scheduling with irregular starting time costs

نویسندگان

چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

On project scheduling with irregular starting time costs

Maniezzo and Mingozzi (Operations Research Letters 25 (1999), pp. 175–182) study a project scheduling problem with irregular starting time costs. Starting from the assumption that its computational complexity status is open, they develop a branch-and-bound procedure and they identify special cases that are solvable in polynomial time. In this note, we present a collection of previously establis...

متن کامل

A Note on Scheduling Problems with Irregular Starting Time Costs

In [9], Maniezzo and Mingozzi study a project scheduling problem with irregular starting time costs. Starting from the assumption that its computational complexity status is open, they develop a branch-and-bound procedure, and identify special cases that are solv-able in polynomial time. In this note, we review three previously established, related results which show that the general problem is...

متن کامل

Project Scheduling with Simultaneous Optimization, Time, Net Present Value, and Project Flexibility for Multimode Activities with Constrained Renewable Resources

Project success is assessed based on various criteria, every one of which enjoys a different level of importance for the beneficiaries and decision makers. Time and cost are the most important objectives and criteria for the project success. On the other hand, reducing the risk of finishing activities until the predetermined deadlines should be taken into account. Having formulated the problem ...

متن کامل

Continuous-time Shortest Path Problems with Stopping and Starting Costs

We describe a general solution method for the problem of finding the shortest path between two vertices of a graph in which each edge has some transit time, costs can vary with time, and stopping and parking (with corresponding costs) are allowed at the vertices.

متن کامل

Predicting project time and costs using earned value management based on trapezoidal fuzzy numbers

Projects include activities that must be carried out at certain dates, with specified costs and determined qualities in order to satisfy the stakeholders. Project control is one of the most important and widely used issues in project-based organizations and it has attracted a lot of attention. So far, in the field of project control, there have been a lot of research that were done in different...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Operations Research Letters

سال: 2001

ISSN: 0167-6377

DOI: 10.1016/s0167-6377(01)00064-5