On the project risk baseline: Integrating aleatory uncertainty into project scheduling

نویسندگان

چکیده

Obtaining a viable schedule baseline that meets all project constraints is one of the main issues for managers. The literature on this topic focuses mainly methods to obtain schedules meet resource restrictions and, more recently, financial limitations. provide different same project, and solutions with shortest duration are considered best-known project. However, no tools currently select which best performs in risk terms. To bridge gap, paper aims propose method selecting highest probability meeting deadline several alternative duration. do so, we integrating aleatory uncertainty into scheduling by quantifying execution alternatives proposed method, tested well-known repository benchmarking, can be applied any type help managers from duration, but lowest risk.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Transforming project risk management into project uncertainty management

This paper argues that all current project risk management processes induce a restricted focus on the management of project uncertainty. In part this is because the term ‘risk’ encourages a threat perspective. In part this is because the term ‘risk’ has become associated with ‘events’ rather than more general sources of significant uncertainty. The paper discusses the reasons for this view, and...

متن کامل

Developing a conceptual model based upon the Latin Hypercube Sampling for integrating OHS into project risk evaluation

Abstract Project management in construction industry, in many cases, is imperfect with respect to the integration of Occupational Health and Safety (OHS) risks. This imperfection exhibits itself as complications affecting the riskiness of industrial procedures and is illustrated usually by poor awareness of OHS within project teams. Difficulties on OHS regularly came about in the construction i...

متن کامل

Project Risk Assessment Framework

This study presents a framework for calculating the risk of various projects, especially projects under uncertain circumstances. First, the related literature is reviewed and then the relationship between risk and projects is examined. Using a case study an approach is provided to determine the project risk in uncertain circumstances where sufficient data is not available for decision-making. I...

متن کامل

Project Risk Assessment Framework

This study presents a framework for calculating the risk of various projects, especially projects under uncertain circumstances. First, the related literature is reviewed and then the relationship between risk and projects is examined. Using a case study an approach is provided to determine the project risk in uncertain circumstances where sufficient data is not available for decision-making. I...

متن کامل

The Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem

This paper presents the formulation and solution of the Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem. The focus of the proposed method is not on finding a single optimal solution, instead on presenting multiple feasible solutions, with cost and duration information to the project manager. The motivation for developing such an approach is due in part to practica...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Computers & Industrial Engineering

سال: 2021

ISSN: ['0360-8352', '1879-0550']

DOI: https://doi.org/10.1016/j.cie.2021.107537