One Improvement Method of Reducing Duration Directly to Solve Time-Cost Tradeoff Problem

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Effects of Project Uncertainties on Nonlinear Time-Cost Tradeoff Profile

This study presents the effects of project uncertainties on nonlinear time-cost tradeoff (TCT) profile of real life engineering projects by the fusion of fuzzy logic and artificial neural network (ANN) models with hybrid meta-heuristic (HMH) technique, abridged as Fuzzy-ANN-HMH. Nonlinear time-cost relationship of project activities is dealt with ANN models. ANN models are then integrated with ...

متن کامل

One-Time Password Authentication Scheme to Solve Stolen Verifier Problem

Secure authentication schemes between an authentication server and users are required to avoid many risks on the Internet. There are three authentication schemes: static password authentications like Basic and Digest Access Authentication[1], public-key certificate schemes, and one-time password schemes. In spite of using SSL/TLS, the static password authentications are known as being insecure ...

متن کامل

Improvement of FPPR method to solve ECDLP

Solving the elliptic curve discrete logarithm problem (ECDLP) by using Gröbner basis has recently appeared as a new threat to the security of elliptic curve cryptography and pairing-based cryptosystems. At Eurocrypt 2012, Faugère, Perret, Petit and Renault proposed a new method (FPPR method) using a multivariable polynomial system to solve ECDLP over finite fields of characteristic 2. At Asiacr...

متن کامل

The stochastic time-cost tradeoff problem: A robust optimization approach

We consider the problem of allocating resources to projects performed under given due dates and stochastic time–cost tradeoff settings. In particular, we show how to implement a state-of-the-art methodology known as “robust optimization” to solve the problem. In contrast to conventional approaches, the model we develop results in management policies rather than optimal values for the original d...

متن کامل

Multi-objective optimization of discrete time–cost tradeoff problem in project networks using non-dominated sorting genetic algorithm

The time–cost tradeoff problem is one of the most important and applicable problems in project scheduling area. There are many factors that force the mangers to crash the time. This factor could be early utilization, early commissioning and operation, improving the project cash flow, avoiding unfavorable weather conditions, compensating the delays, and so on. Since there is a need to allocate e...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Physics Procedia

سال: 2012

ISSN: 1875-3892

DOI: 10.1016/j.phpro.2012.02.226