One Improvement Method of Reducing Duration Directly to Solve Time-Cost Tradeoff Problem
نویسندگان
چکیده
منابع مشابه
Effects of Project Uncertainties on Nonlinear Time-Cost Tradeoff Profile
This study presents the effects of project uncertainties on nonlinear time-cost tradeoff (TCT) profile of real life engineering projects by the fusion of fuzzy logic and artificial neural network (ANN) models with hybrid meta-heuristic (HMH) technique, abridged as Fuzzy-ANN-HMH. Nonlinear time-cost relationship of project activities is dealt with ANN models. ANN models are then integrated with ...
متن کاملOne-Time Password Authentication Scheme to Solve Stolen Verifier Problem
Secure authentication schemes between an authentication server and users are required to avoid many risks on the Internet. There are three authentication schemes: static password authentications like Basic and Digest Access Authentication[1], public-key certificate schemes, and one-time password schemes. In spite of using SSL/TLS, the static password authentications are known as being insecure ...
متن کاملImprovement of FPPR method to solve ECDLP
Solving the elliptic curve discrete logarithm problem (ECDLP) by using Gröbner basis has recently appeared as a new threat to the security of elliptic curve cryptography and pairing-based cryptosystems. At Eurocrypt 2012, Faugère, Perret, Petit and Renault proposed a new method (FPPR method) using a multivariable polynomial system to solve ECDLP over finite fields of characteristic 2. At Asiacr...
متن کاملThe stochastic time-cost tradeoff problem: A robust optimization approach
We consider the problem of allocating resources to projects performed under given due dates and stochastic time–cost tradeoff settings. In particular, we show how to implement a state-of-the-art methodology known as “robust optimization” to solve the problem. In contrast to conventional approaches, the model we develop results in management policies rather than optimal values for the original d...
متن کاملMulti-objective optimization of discrete time–cost tradeoff problem in project networks using non-dominated sorting genetic algorithm
The time–cost tradeoff problem is one of the most important and applicable problems in project scheduling area. There are many factors that force the mangers to crash the time. This factor could be early utilization, early commissioning and operation, improving the project cash flow, avoiding unfavorable weather conditions, compensating the delays, and so on. Since there is a need to allocate e...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Physics Procedia
سال: 2012
ISSN: 1875-3892
DOI: 10.1016/j.phpro.2012.02.226