Optical Submarine Cable Installation Procedure

نویسندگان

چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

The NEPTUNE Scientific Submarine Cable System

The NEPTUNE scientific submarine cable system will “wire” the Juan de Fuca tectonic plate and turn it into an interactive ocean sciences laboratory. NEPTUNE will provide 30 seafloor nodes distributed over a 500 by 1000 km area to which many scientific instruments may be attached. The nodes will supply power at the several kW level and data communications at a Gb/s rate. NEPTUNE will utilize an ...

متن کامل

Non-cooperative Diagnosis of Submarine Cable Faults

Submarine cable faults are not uncommon events in the Internet today. However, their impacts on end-to-end path quality have received almost no attention. In this paper, we report path-quality measurement results for a recent SEA-ME-WE 4 cable fault in 2010. Our measurement methodology captures the path-quality degradation due to the cable fault, in terms of delay, asymmetric packet losses, and...

متن کامل

Wavelength Demultiplexer for Optically Amplified WDM Submarine Cable System

The wavelength demultiplexer, using cascaded optical fiber gratings and circulators, was proposed and developed for application to optically amplified wavelength-division multiplexing (WDM) submarine cable systems with 100GHz channel spacing. Our proposed demultiplexer cannot only achieve high wavelength selectivity, small excess loss and effective allocation of dispersion compensation fibers f...

متن کامل

Physical Oceanography from Deep Ocean Submarine Cable Observatories

Seafloor cabled observatories have an obvious role as part of the sustained infrastructure needed to observe climate variability. To highlight this point a couple of important discoveries of the physical climate of the ocean that have been based on data acquired at open ocean “observatories” are reviewed. Perhaps the more important role for observatories in physical oceanography may be the prov...

متن کامل

Experimental study on the Wind Farm Substation Cable Installation Problem

The planning of wind farms exhibits several interesting problems. One of them is the minimum cost cable installation in wind farms. In this master thesis we regard a subproblem of it, namely the Substation Cable Installation Problem (SCIP). The SCIP deals with the minimum cable installation connecting wind turbines to a substation. It is therefore defined as follows: Given a set of coordinates ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Marine Engineering

سال: 2018

ISSN: 1346-1427,1884-3778

DOI: 10.5988/jime.53.863