Optimal and heuristic lead-time quotation for an integrated steel mill with a minimum batch size
نویسندگان
چکیده
منابع مشابه
Optimal and heuristic lead-time quotation for an integrated steel mill with a minimum batch size
Follow this and additional works at: http://engagedscholarship.csuohio.edu/bus_facpub Part of the Business Administration, Management, and Operations Commons Publisher's Statement NOTICE: this is the author’s version of a work that was accepted for publication in European Journal of Operational Research. Changes resulting from the publishing process, such as peer review, editing, corrections, s...
متن کاملAn integrated vendor–buyer model with stochastic demand, lot-size dependent lead-time and learning in production
In this article, an imperfect vendor–buyer inventory system with stochastic demand, process quality control and learning in production is investigated. It is assumed that there are learning in production and investment for process quality improvement at the vendor’s end, and lot-size dependent lead-time at the buyer’s end. The lead-time for the first batch and those for the rest of the batches ...
متن کاملScheduling and Reliable Lead-Time Quotation for Orders with Availability Intervals and Lead-Time Sensitive Revenues
Pinar Keskinocak • R. Ravi • Sridhar Tayur School of Industrial and Systems Engineering, Georgia Institute of Technology, Atlanta, Georgia 30332-0205 Graduate School of Industrial Administration, Carnegie Mellon University, Pittsburgh, Pennsylvania 15213 Graduate School of Industrial Administration, Carnegie Mellon University, Pittsburgh, Pennsylvania 15213 [email protected] • [email protected] ...
متن کاملAn Integrated Inventory Model with Controllable Lead time and Setup Cost Reduction for Defective and Non-Defective Items
In this paper, the study deals with the lead time and setup reduction problem in the vendor-purchaser integrated inventory model. The cost of capital (i.e., opportunity cost) is one of the key factors in making the inventory and investment decisions. Lead time is an important element in any inventory system. The proposed model is presents an integrated inventory model with controllable lead tim...
متن کاملScheduling Accumulated Rework in a Normal Cycle: Optimal Batch Production with Minimum Rework Cycles
In this paper we consider a single machine system that produces items part of which are defective. The defective items produced in a time period, consisting of several equal cycles, are accumulated and are all reworked in the last cycle of this period called the rework cycle. At the end of the rework cycle the whole process will start all over again. The first significant objective of this stud...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: European Journal of Operational Research
سال: 2011
ISSN: 0377-2217
DOI: 10.1016/j.ejor.2010.09.031