Optimal Electric Generation Planning for Interconnected Systems by Benders Decomposition

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Accelerating the Composite Power System Planning by Benders Decomposition

This paper presents an application of Benders decomposition to deal with the complexities in the simultaneous Generation Expansion Planning (GEP) and Transmission Expansion Planning (TEP). Unlike the power system operation fields of study, the power system planning methods are not expected to be fast. However, it is always preferable to speed up computations to provide more analysis options for...

متن کامل

Generation Expansion Planning Using Benders’ Decomposition and Generalized Networks

This paper presents an optimization model and its application to a generation expansion planning problem. The proposed model has a generalized network structure and is exploited effectively by Benders’ decomposition algorithm, where a master problem generates trial expansion plans and a set of subproblems compute production cost and system reliability for the trial plan. The applicability of ou...

متن کامل

accelerating the composite power system planning by benders decomposition

this paper presents an application of benders decomposition to deal with the complexities in the simultaneous generation expansion planning (gep) and transmission expansion planning (tep). unlike the power system operation fields of study, the power system planning methods are not expected to be fast. however, it is always preferable to speed up computations to provide more analysis options for...

متن کامل

Planning and Scheduling by Logic-Based Benders Decomposition

We combine mixed integer linear programming (MILP) and constraint programming (CP) to solve an important class of planning and scheduling problems. Tasks are allocated to facilities using MILP and scheduled using CP, and the two are linked via logic-based Benders decomposition. Tasks assigned to a facility may run in parallel subject to resource constraints (cumulative scheduling). We solve pro...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IEEJ Transactions on Power and Energy

سال: 1993

ISSN: 0385-4213,1348-8147

DOI: 10.1541/ieejpes1990.113.6_643