Optimal Scheduling of Material Handling Devices in a PCB Production Line: Problem Formulation and a Polynomial Algorithm

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Optimal Scheduling of Material Handling Devices in a PCB Production Line: Problem Formulation and a Polynomial Algorithm

Modern automated production lines usually use one or multiple computer-controlled robots or hoists for material handling between workstations. A typical application of such lines is an automated electroplating line for processing printed circuit boards PCBs . In these systems, cyclic production policy is widely used due to large lot size and simplicity of implementation. This paper addresses cy...

متن کامل

A flow-shop problem formulation of biomass handling operations scheduling

Currently, the planning of the biomass collection operations is performed relying on the contractor’s experience without the use of any dedicated planning tool. It is expected that more explicitly formulated planning tools would provide benefits on securing the supply chain of biomass feedstock. In this study, the problem of finding a permutation schedule for a number of geographically disperse...

متن کامل

cohesion and cohesive devices in a contrastive analysis between ge and esp texts

the present study was an attempt to conduct a contrastive analysis between general english (ge) and english for specific purposes (esp) texts in terms of cohesion and cohesive devices. to this end, thirty texts from different esp and ge textbooks were randomly selected. then they were analyzed manually to find the frequency of cohesive devices. cohesive devices include reference, substitution, ...

15 صفحه اول

Evolutionary algorithm for PCB scheduling problem

This study focuses on PCB scheduling problem with sequence-dependent setup times on a single machine and feeder capacity constraint. The objective of the scheduling problem is to minimize the total weighted tardiness. The evolutionary algorithms to solve this PCB scheduling problem is an integration of genetic algorithm, local search procedure, heuristic scheduling rule and Keep Tool Needed Soo...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Mathematical Problems in Engineering

سال: 2008

ISSN: 1024-123X,1563-5147

DOI: 10.1155/2008/364279