Optimal scheduling of track maintenance activities for railway networks

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Genetic and memetic algorithms for scheduling railway maintenance activities

Nowadays railway companies are confronted with high infrastructure maintenance costs. Therefore good strategies are needed to carry out these maintenance activities in a most cost effective way. In this paper we solve the preventive maintenance scheduling problem (PMSP) using genetic algorithms, memetic algorithms and a two-phase heuristic based on opportunities. The aim of the PMSP is to sched...

متن کامل

A heuristic approach to railway track maintenance scheduling

Travelling safely and comfortably on high speed railway lines requires excellent conditions of the whole railway infrastructure in general and of the railway track geometry in particular. The maintenance process required to achieve such excellent conditions is largely complex and expensive, demanding an increased amount of both human and technical resources. In this framework, an optimal schedu...

متن کامل

Railway Track Stiffness - Dynamic Measurements and Evaluation for Efficient Maintenance

v Outline of Thesis vii Author contribution of papers ix Contribution of Thesis xi

متن کامل

Optimal Scheduling of Connections in Railway Systems

Complex railway networks typically consist of widely diffused OD-pairs by which it is impossible to provide direct trips only. Therefore, passengers often have to change trains at transfer stations. Guaranteeing scheduled connections is complicated by delays during operation. To improve and maintain the quality of transfers requires optimal scheduling and control of connections at transfer stat...

متن کامل

Heuristic based track maintenance scheduling optimisation

The maintenance of railway track is highly relevant for the service quality and safety. This task demands huge technical and human resources. Therefore an optimal deployment of the available resources is crusial for the cost-effectiveness of railway operation. Furthermore, the track geometry maintenance activities need to be planned up to two years in advance. For this reason the French railway...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IFAC-PapersOnLine

سال: 2018

ISSN: 2405-8963

DOI: 10.1016/j.ifacol.2018.07.063