OPTIMALISASI BIAYA DAN WAKTU PELAKSANAAN PROYEK PEMBANGUNAN PERUMAHAN CITRALAND PALU MENGGUNAKAN METODE PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT) – CRITICAL PATH METHOD (CPM)
                    
                        
                            نویسندگان
                            
                            
                        
                        
                    
                    
                    چکیده
منابع مشابه
E-Monitoring Program Pembangunan Infrastruktur Perdesaan (PPIP) pada Dinas PU Cipta Karya dan Pengairan Kabupaten Muba
Information technology is widely used as a media monitor various activities. In this study, the authors will utilize IT to monitor the Rural Infrastructure Development Program (PPIP). PPIP is a program of community development at the village level in the framework of the provision of basic infrastructure in rural settlements carried out by the Directorate General of Human Settlements Ministry o...
متن کاملProject Evaluation Method Based on Matter-Element and Hierarchy Model
Abstrak Evaluasi proyek selalu menjadi kunci dari manajemen proyek rekayasa. Evaluasi proyek adalah pekerjaan yang kompleks yang melibatkan banyak faktor. Hasil evaluasi akhir selalu dipengaruhi langsung oleh definisi indeks evaluasi yang bervariasi dan bobot yang terkait. Makalah ini terutama mempelajari penilaian kemampuan para ahli dan pembentukan sistem evaluasi proyek indeks dalam tinjauan...
متن کاملA Study of Using Simulation to Overcome Obstacles That Block the Implementation of Critical Chain Project Management to Project Management Environment
Since 1997, the Critical Chain Project Management (CCPM) method has received considerable attention. Hundreds of successful CCPM cases have achieved highly reliable on-time delivery (OTD) with short project lead-time (PLT) in multi-project environments. However, two obstacles have remained, blocking the implementation of CCPM to project management (PM) society. The first has been addressed by P...
متن کاملPenambahan emosi menggunakan metode manipulasi prosodi untuk sistem text to speech bahasa Indonesia
Abstrak—Text To Speech (TTS) merupakan suatu sistem yang dapat mengonversi teks dalam format suatu bahasa menjadi ucapan sesuai dengan pembacaan teks dalam bahasa yang digunakan. Fokus penelitian yaitu suatu konsep pengucapan natural, dengan usaha “memanusiakan” pelafalan sintesa suara sistem Text To Speech yang dihasilkan. Kebutuhan utama yang digunakan untuk sistem Text To Speech dalam peneli...
متن کاملKlasifikasi Data Cardiotocography Dengan Integrasi Metode Neural Network Dan Particle Swarm Optimization
Backpropagation (BP) adalah sebuah metode yang digunakan dalam training Neural Network (NN) untuk menentukan parameter bobot yang sesuai. Proses penentuan parameter bobot dengan menggunakan metode backpropagation sangat dipengaruhi oleh pemilihan nilai learning rate (LR)-nya. Penggunaan nilai learning rate yang kurang optimal berdampak pada waktu komputasi yang lama atau akurasi klasifikasi yan...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: JURNAL ILMIAH MATEMATIKA DAN TERAPAN
سال: 2018
ISSN: 2540-766X,1829-8133
DOI: 10.22487/2540766x.2018.v15.i2.11353