Optimization of Bogie Frame in Indian Railway
نویسندگان
چکیده
منابع مشابه
The East Indian Railway
Proceeding up the country in March last, we bethought ourselves it might be useful to note the state of the line generally, the sanitary and conservancy arrangements in vogue, and the practical conveniences at several stations, with a view to forming an opinion as to the care and attention paid to these matters "on the line." The barrack offices for troops, although somewhat improved of late ye...
متن کاملOptimization in railway scheduling
Train scheduling has been a significant issue in the railway industry. Over the last few years, numerous approaches and tools have been developed to aid in the management of railway infrastructure. In this paper, we describe some techniques, which was developed in a project in collaboration with the Spanish Railway Infractructure Manager (ADIF). We formulate train scheduling as constraint optim...
متن کاملFlows in railway optimization
The Netherlands has an intricate network of railway tracks to connect its many closely situated cities. Recently, the railroad timetable has been completely updated. Unlike the yearly manual adjustments of the past, this update was done using mathematical techniques. For the Dutch public, this was a rare opportunity to come into contact with mathematics. The research that resulted in the new ti...
متن کاملInvestigating on the Effects of Random Irregularities of Railway Track by Half-Bogie Model
The vibrations produced by trains include two parts which are deterministic and random vibrations. Due to variation of dynamic loads and patterns of load-time, the random vibration of moving train is one of the most important issues in the field of railway engineering. One of the important sources in producing the train vibrations is rail roughness and irregularities. In this paper, responses o...
متن کاملThe Experiment Study for Fatigue Strength of Bogie Frame of Beijing Subway Vehicle Under Overload Situation
In this paper, a problem for safety of bogie frame of subway vehicle under overload situation has been discussed. Firstly, the structure of bogie frame and service condition are introduced to explain the reason caused fatigue failure. Then, the testing points are selected in terms of the structure of bogie frame, the characteristics of processing technique, load transfer path and the operation ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Indian Journal of Science and Technology
سال: 2015
ISSN: 0974-6846,0974-5645
DOI: 10.17485/ijst/2015/v8i31/84308