Optimization of Dump Bench Configuration to Improve Waste Dump Capacity of Narynsukhait Open Pit Coal Mine

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Chapter 11: Mine Waste Dump

The Overburden of waste and uneconomic mineralized rock is required to be removed to mine the useful mineral resource in a surface mining operation. In this process a dump is formed by casting the waste material and dumping it in nearby area. The dump so formed is known as mine waste dump. Waste dump may be classified as internal and external dump. External dump is created outside the pit where...

متن کامل

Optimization of Design Parameters and Intelligent Back-analysis of High Bench Dump Slope in Open Pit

Dump engineering is an important part in production processes of open-pit mining. In order to complete the mine production tasks smoothly, it is necessary to make the most of land possessed by the dump in an economical and reasonable way. In the paper, we use the dump of Qidashan iron mine which belongs to Anshan Iron and Steel Group as an engineering background to achieve the aim of improving ...

متن کامل

Application of GPS & GPRS Technology to Field Data Acquisition in Coal Mine Dump Area

Because of the complexity and diversity of the terrain and cover types in coal mine dump, it is difficult to set up the research points in the wild dump. This paper introduces an embedded GPS and GIS technology and develops portable environmental information acquisition system applied to coal mine dump investigation. The system mainly achieves the functions of soil, vegetation, microclimate sam...

متن کامل

Remote Sensing Detection for Subsidence-resulted Water Body and Solid-waste Dump in Coal Mine: Yanzhou Being a Case

Taking LandSat TM/ETM+ images as information source, this paper used the Normalized Difference Water Index (NDWI) to extract mining subsidence-resulted surface water body information in Yanzhou coal mining area. It was found that the extracted water body information would be mixed with solid-waste dumps. Taking DN 40 in band 5 as threshold value, the water bodies and solid-waste dumps were iden...

متن کامل

A new developed model to determine waste dump site selection in open pit mines: An approach to minimize haul road construction cost

Today, during the life of an open pit mine, million tons of materials, including waste and ore, are displacing by truck fleets. In the case of a shallow ore deposit, which is located up to 300 meters to the ground surface, depending on preliminary equipment size and capacity, it will take three to five years to remove overburden and waste rocks to expose the ore body. In that period, the main w...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Geosciences

سال: 2018

ISSN: 2156-8359,2156-8367

DOI: 10.4236/ijg.2018.96024