Optimization of plugging design for well abandonment–Risk management of long-term well integrity

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

investigating the feasibility of a proposed model for geometric design of deployable arch structures

deployable scissor type structures are composed of the so-called scissor-like elements (sles), which are connected to each other at an intermediate point through a pivotal connection and allow them to be folded into a compact bundle for storage or transport. several sles are connected to each other in order to form units with regular polygonal plan views. the sides and radii of the polygons are...

the effects of keyword and context methods on pronunciation and receptive/ productive vocabulary of low-intermediate iranian efl learners: short-term and long-term memory in focus

از گذشته تا کنون، تحقیقات بسیاری صورت گرفته است که همگی به گونه ای بر مثمر ثمر بودن استفاده از استراتژی های یادگیری لغت در یک زبان بیگانه اذعان داشته اند. این تحقیق به بررسی تاثیر دو روش مختلف آموزش واژگان انگلیسی (کلیدی و بافتی) بر تلفظ و دانش لغوی فراگیران ایرانی زیر متوسط زبان انگلیسی و بر ماندگاری آن در حافظه می پردازد. به این منظور، تعداد شصت نفر از زبان آموزان ایرانی هشت تا چهارده ساله با...

15 صفحه اول

the effect of lexical and grammatical collocation instruction through input flooding versus awareness raising on short-term and delayed retention as well a active use

this study attempted to explore if teaching english collocations through two different modes of awareness-raising and input flooding has any possible differential effect on immediate retention as well as retention in a delayed assessment. it also compared the possible differential effect of teaching english collocations implicitly and explicitly on actively using the items in writing. m...

15 صفحه اول

Hybrid-optimization algorithm for the management of a conjunctive-use project and well field design.

Hi-Desert Water District (HDWD), the primary water-management agency in the Warren Groundwater Basin, California, plans to construct a waste water treatment plant to reduce future septic-tank effluent from reaching the groundwater system. The treated waste water will be reclaimed by recharging the groundwater basin via recharge ponds as part of a larger conjunctive-use strategy. HDWD wishes to ...

متن کامل

effective workflow for optimization of intelligent well completions

intelligent wells provide the ability for monitoring and control of downhole environment of the wells. downhole monitoring is achieved through sensors while control is realized with downhole valves. recovery from intelligent wells can be improved by proper selection of candidate wells/fields and optimizing the number, location and performance of the installed interval control valves. design cri...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Energy Procedia

سال: 2009

ISSN: 1876-6102

DOI: 10.1016/j.egypro.2009.02.153