Optimization of Hydro-Power Plants for Generation
A decision support system is presented that addresses optimal unit dispatch and load allocation in a multi-unit hydroelectric plant. The concept behind the optimization approach is explained. Estimates of the improvements this system can provide over existing plant operational methodologies are provided. Actual use of this system has provided gains of over 2% in plant performance.
متن کاملDesign of Micro - Hydro - Electric Power Station
Micro-hydro-electric power is both an efficient and reliable formof clean source of renewable energy. It can be an excellent method of harnessing renewable energy from small rivers and streams. The micro-hydro project designed to be a run -of-river type, because it requires very little or no reservoir in order to power the turbine. The water will run straight through the turbine and back into t...
متن کاملOptimization of Power Output of a Micro-hydro Power Station Using Fuzzy Logic Algorithm
In this study the electric power generation from the Kayabogazi Dam has been investigated using Fuzzy logic algorithm to optimize the required power demand. In the implementation of the algorithm the real data recorded by the State Water Works (DSI) which is representing monthly average water flow to the Kayabogazi Dam has been used. An easy and operator friendly control algorithm has been deve...
متن کاملPid Control for Micro-hydro Power Plants Based on Neural Network
Micro-hydro power plants are power plants with small capacity, which is built in specific locations. The main problem of micro-hydro is the voltage generated is not stable at 220 VA and frequency of 50 Hz. A microhydro that was constructed by Lie Jasa et al. in Gambuk village at Pupuan sub-district, Tabanan district of Bali province, Indonesia in 2010 is still an open loop system in which spin ...
متن کاملIntraday Optimization of Pumped Hydro Power Plants in the German Electricity Market ¬リニ
Historically, the optimal production of hydro power plants was determined once day ahead. Today, many regulatory requirements in the German electricity market make this process much more complex: Power plant operators are committed to report information on planned production and even on provision of balancing energy of each single generator to transmission system operators. As soon as a deviati...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Buletin Ilmiah Sarjana Teknik Elektro
سال: 2021
ISSN: 2685-9572,2685-7936
DOI: 10.12928/biste.v3i1.1477