Optimization of Work Schedules Executed using the Flow Shop Model, Assuming Multitasking Performed by Work Crews

نویسندگان

چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Gender, work schedules and work/family regulation.

The Gender and Work Technical Committee (TC) of the International Ergonomics Association (IEA) is responsible for this issue of the journal WORK. Since many of the authors come from the scholarly tradition of ergonomic analysis of work activity, we should explain that, in this context, the word “regulation” refers to the attempts made byworkers andworkers’ groups to manage job requirements and ...

متن کامل

the use of appropriate madm model for ranking the vendors of mci equipments using fuzzy approach

abstract nowadays, the science of decision making has been paid to more attention due to the complexity of the problems of suppliers selection. as known, one of the efficient tools in economic and human resources development is the extension of communication networks in developing countries. so, the proper selection of suppliers of tc equipments is of concern very much. in this study, a ...

15 صفحه اول

the effect of using model essays on the develpment of writing proficiency of iranina pre-intermediate efl learners

abstract the present study was conducted to investigate the effect of using model essays on the development of writing proficiency of iranian pre-intermediate efl learners. to fulfill the purpose of the study, 55 pre- intermediate learners of parsa language institute were chosen by means of administering proficiency test. based on the results of the pretest, two matched groups, one as the expe...

Simultaneous production planning and scheduling in a hybrid flow shop with time periods and work shifts

Simultaneous production planning and scheduling has been identified as one of the most important factors that affect the efficient implementation of planning and scheduling operations for the production systems. In this paper, simultaneous production planning and scheduling is applied in a hybrid flow shop environment, which has numerous applications in real industrial settings. In this problem...

متن کامل

Is the blood flow response to a single contraction determined by work performed?

Nine healthy volunteers performed a series of single handgrip isometric contractions to test the hypothesis that the blood flow response to a contraction is determined solely by the tension-time index (isometric analog of work). Contractions were performed in duplicate at 15, 30, and 60% of maximal voluntary contraction (MVC) at durations of 0.5, 1, and 2 s. Forearm blood flow (FBF) was measure...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Archives of Civil Engineering

سال: 2017

ISSN: 1230-2945

DOI: 10.1515/ace-2017-0037