Optimum operation control for multiple machining projects under fixed production interval

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Optimum Operation Control for Multiple Machining Projects under Fixed Production Interval

The dynamic MRR control is the goal to optimize machining operations in the CNC machining systems. The concentration on the minimum-cost machining control with material removal rate (MRR) grows up in the computer-based machining industry. In this paper, the mathematical modeling with dynamic MRR control to minimize the machining cost as well as schedule the due-dates for multiple machining proj...

متن کامل

Effects of d-amphetamine on performance under several parameters of multiple fixed-ratio, fixed-interval schedules.

Simultaneous Quantitative Assessment of Morphine Tolerance and Physical Dependence. E. LEONG WAY, HORACE H. LOB AND Fu-H5IUNG SHEN 1 Effects of Analgesics and Other Drugs on Mice in Phenylquinone and Rotarod Tests. JACK PEARL, HERBERT STANDER AND DONNA B. MCKEAN 9 Effects of Halothane upon Auditory Recovery Functions in Cats. LUKE M. KITAHATA, Y05HIKUNI AMAKATA AND ROBERT GALAMBOS 14 Effects of...

متن کامل

A New Version of Earned Value Analysis for Mega Projects Under Interval-valued Fuzzy Environment

The earned value technique is a crucial and important technique in analysis and control the performance and progress of mega projects by integrating three elements of them, i.e., time, cost and scope. This paper proposes a new version of earned value analysis (EVA) to handle uncertainty in mega projects under interval-valued fuzzy (IVF)-environment. Considering that uncertainty is very common i...

متن کامل

Optimum Design of Penstock for Hydro Projects

Penstock, a closed conduit, is an important component of hydropower projects. Various optimum design of penstock. These methods are either based on friction loss in the penstock. These formulae formulae available for penstock design have been compared the optimum design of penstock based on minimizing developed method, diameter and annual cost of penstocks out and reduction in annual cost of pe...

متن کامل

Multiple Model Control for Teleoperation Under Time Delay MULTIPLE MODEL CONTROL FOR TELEOPERATION UNDER TIME DELAY

Performance and stability of bilateral teleoperation control systems are adversely affected by variations in environment dynamics and time delay in communication channel. Prior relevant research in the literature has mainly yielded control algorithms that sacrifice performance in order to guarantee robust stability. In contrast, this thesis proposes methods to deal with these two main problems ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Statistics and Management Systems

سال: 2005

ISSN: 0972-0510,2169-0014

DOI: 10.1080/09720510.2005.10701174