Optimum Production Control and Workforce Scheduling of Machining Project

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Optimum workforce scheduling under the (14, 21) days-off timetable

An efficient optimum solution is presented for a real-life employee daysoff scheduling problem with a three-week cycle. Over a given work cycle, each worker is given 14 successive workdays and 7 successive off days. This three-week days-off timetable is referred to as the (14, 21) schedule. Given different labor demands for each day of the week, the primary objective is to minimize the number o...

متن کامل

Optimum Operation Control for Multiple Machining Projects under Fixed Production Interval

The dynamic MRR control is the goal to optimize machining operations in the CNC machining systems. The concentration on the minimum-cost machining control with material removal rate (MRR) grows up in the computer-based machining industry. In this paper, the mathematical modeling with dynamic MRR control to minimize the machining cost as well as schedule the due-dates for multiple machining proj...

متن کامل

Machine scheduling for multitask machining

Multitasking is an important part of today’s manufacturing plants. Multitask machine tools are capable of processing multiple operations at the same time by applying a different set of part and tool holding devices. Mill-turns are multitask machines with the ability to perform a variety of operations with considerable accuracy and agility. One critical factor in simultaneous machining is to cre...

متن کامل

Project Scheduling Approach to Production Planning

We suggest a novel approach to modelling and solving production planning (PP) problems in make-to-order production environments. This approach unifies the capacity and the material flow oriented aspects of PP. Orders are modelled as projects that compete for limited resources. The projects consist of networks of variable-intensity activities which may require several resources at the same time....

متن کامل

Scheduling and Production & Control: MA 27. Scheduling and Production & Control: MA

This chapter addresses three main problems of the production planning area: Single Machine Scheduling (SMS), Parallel Machine Scheduling (PMS) and Flowshop Scheduling (FS). Many situations in production environments found in industries around the world can be modelled as one or a set of them (Baker 1974). It is easy to find dozens of problem variants in the literature due to different productio...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Applied Sciences

سال: 2008

ISSN: 1812-5654

DOI: 10.3923/jas.2008.836.841