Packet delay analysis of IEEE 802.11 MAC protocol

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Packet delay analysis of IEEE 802.11 MAC protocol - Electronics Letters

A new packet delay analysis for the IEEE 802.11b protocol is developed by extending throughput analysis introduced by Bianchi. This analysis is validated by comparison with simulation results using the OPNET simulation package. Packet delay results are presented as a function of a number of stations and packet size for basic access and RTS=CTS medium access mechanisms. The proposed analysis ide...

متن کامل

Packet error model for the IEEE 802.11 MAC protocol

Packet error in the IEEE 802.11 network is one source of performance degradation and its variability. Most of the previous works study how collision avoidance and hidden terminals affect the IEEE 802.11 performance metrics, such as probability of a collision and saturation throughput. In this paper we focus on the effect of packet errors on capacity and variability of the IEEE 802.11 MAC protoc...

متن کامل

Packet delay analysis of the advanced infrared (AIr) CSMA/CA MAC protocol in optical wireless LANs

During the past few years the wireless technology market has experienced a tremendous growth. Users today expect to be able to communicate and access data anytime, anywhere, using almost any portable device. Infrared Data Association (IrDA) addressed the requirement for indoor multipoint wireless connectivity with the development of the advanced infrared (AIr) protocol stack utilizing the infra...

متن کامل

Delay Analysis of an Enhancing IEEE 802.11 Point Coordination Function MAC Protocol

The widespread use of multimedia networking applications has brought more requirements to the network, creating a need for end-to-end Quality of Service (QoS). The contention-free Point Coordination Function (PCF) with Round Robin scheme, where the Access Point controls all transmissions based on a polling mechanism, is defined in IEEE 802.11 standard to provide QoS service. This network suffer...

متن کامل

Analysis the MAC Protocol of IEEE 802.11 Wireless LAN

An ad hoc network is a collection of wireless mobile nodes dynamically forming a temporary network without the use of any existing network infrastructure or centralized administration. The architecture of the IEEE 802.11 WLAN is designed to support a network where most decision making is distributed to the mobile striation. The first, IEEE Standard 802.11a, is an orthogonal frequency domain mul...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Electronics Letters

سال: 2003

ISSN: 0013-5194

DOI: 10.1049/el:20030868