Partial flexible job shop scheduling considering preventive maintenance and priorities

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Scheduling integrated flexible job - shop problem with preventive maintenance to minimize makespan and system unavailability

Integrating flexible job-shop scheduling problem (FJSP) with preventive maintenance (PM) is pondered in this paper. Minimizing the makespan for scheduling part and minimizing the system unavailability for maintenance part are simultaneously under consideration. For doing it, the assignment of n jobs on m machines in production side and executing the PM actions at appropriate time intervals in m...

متن کامل

Flexible job shop scheduling under availability constraints

In this paper, an exact geometric algorithm is presented for solving two-job sequencing and scheduling problems in flexible flow shop and job shop environments while the resources are (un)available in some time periods and processors (un)availability is the same in all work centers. This study seems utterly new and it is applicable to any performance measure based on the completion time. The in...

متن کامل

Flexible Job-Shop Scheduling Problems

Planning and scheduling problems in various industrial environments are combinatorial and very difficult. Generally, it is extremely hard to solve these types of problems in their general form. Scheduling can be formulated as a problem of determining the best sequence to execute a set of tasks on a set of resources, respecting specific constraints like precedence or disjunctive constraints (Car...

متن کامل

flexible job shop scheduling under availability constraints

in this paper, an exact geometric algorithm is presented for solving two-job sequencing and scheduling problems in flexible flow shop and job shop environments while the resources are (un)available in some time periods and processors (un)availability is the same in all work centers. this study seems utterly new and it is applicable to any performance measure based on the completion time. the in...

متن کامل

Solving Flexible Job Shop Scheduling with Multi Objective Approach

  In this paper flexible job-shop scheduling problem (FJSP) is studied in the case of optimizing different contradictory objectives consisting of: (1) minimizing makespan, (2) minimizing total workload, and (3) minimizing workload of the most loaded machine. As the problem belongs to the class of NP-Hard problems, a new hybrid genetic algorithm is proposed to obtain a large set of Pareto-optima...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: WPOM-Working Papers on Operations Management

سال: 2020

ISSN: 1989-9068

DOI: 10.4995/wpom.v11i2.14187