Perancangan Man Hour Integrated Control Application pada Perusahaan Barbasis Project

نویسندگان

چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Perancangan basisdata sistem informasi penggajian

s: The purpose of this research is to design database scheme of information system at ‘XYZ’ University. By using database design methods (conceptual scheme, logical scheme, & physical scheme) the writer designs payroll information system. The physical scheme is compatible with Borland Delphi Database Engine Scheme to support the implementation of the I.S. After 3 (three) steps we get 7 (seven) ...

متن کامل

QoS Control: an Application Integrated Framework

Network technology is becoming simpler in order to support the widest possible range of user applications. Therefore, the specific requirements of each application must be performed outside of the network and the adaptation mechanisms should be done by the applications. For the case of multimedia applications the programming task can even be more simplified if several “low-level” aspects can be...

متن کامل

Construction Project Planning and Control Integrated System Model

A conceptual model of an integrated system for construction project planning and control is presented in this paper. The model is the result from an exploratory study upon current construction project management practice in small and medium size companies in Southeast Mexico. The model provides a general solution to the problems detected in the study, based on two key sources: 1) the managers’ ...

متن کامل

Toward integrated opisthorchiasis control in northeast Thailand: the Lawa project.

Human liver fluke, Opisthorchis viverrini, a food-borne trematode is a significant public health problem in Southeast Asia, particularly in Thailand. Despite a long history of control programmes in Thailand and a nationwide reduction, O. viverrini infection prevalence remains high in the northeastern provinces. Therefore, a new strategy for controlling the liver fluke infection using the EcoHea...

متن کامل

An Integrated Efficiency–Risk Approach in Sustainable Project Control

The lack of integrated project control techniques covering both qualitative and quantitative indices is one of the most important reasons leading to unfinished projects under predetermined schedules and expected budgets. Two modern techniques proposed in project control—the critical chain method and buffer management (CCM/BM), and the earned value analysis or earned value management and earned ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: ComTech: Computer, Mathematics and Engineering Applications

سال: 2013

ISSN: 2476-907X,2087-1244

DOI: 10.21512/comtech.v4i1.2746