PERFORMANCE IMPROVEMENT FOR PUBLIC CONSTRUCTION PROJECTS USING RISK ANALYSIS
نویسندگان
چکیده
منابع مشابه
designing a model for selecting construction projects in public sector
much research hasn’t been done in the area of project selection in the public sector. in this paper, we tried to choose projects in the public sector, and a linear programming model is presented. in an effort to build the model, the decision criteria were identified using the delphi method and then the criteria were reviewed at conceptual combining. the model was constructed in a linear, goal a...
متن کاملRisk Analysis for Design-Build Construction Projects: A Simplified Approach
Construction Projects are being implemented under different contract systems in the Midwest. Negotiated design-build has been a popular contract system in recent years. It provides various advantages through entailing the contractor to be responsible for the whole project. However, design-build turns out to be risky system for both owners and contractors unless the risks are identified, quantif...
متن کاملanalysis of ruin probability for insurance companies using markov chain
در این پایان نامه نشان داده ایم که چگونه می توان مدل ریسک بیمه ای اسپیرر اندرسون را به کمک زنجیره های مارکوف تعریف کرد. سپس به کمک روش های آنالیز ماتریسی احتمال برشکستگی ، میزان مازاد در هنگام برشکستگی و میزان کسری بودجه در زمان وقوع برشکستگی را محاسبه کرده ایم. هدف ما در این پایان نامه بسیار محاسباتی و کاربردی تر از روش های است که در گذشته برای محاسبه این احتمال ارائه شده است. در ابتدا ما نشا...
15 صفحه اولFactor Analysis of Risk Variables Affecting Occupational Injuries: A Field Study in Construction Projects
Background and Objective: Approximately, half of the occupational accidents are associated with the construction industry in Iran. Therefore, the factor analysis of risk variables affecting occupational injuries in the construction industry can lead to understanding and reducing the rate of injuries in these projects. The purpose of this study was to identify the risk factors affecting the type...
متن کاملEquitable Risk Allocation in Construction Projects: Fuzzy Bargaining Game Approach
An equitable risk allocation between contracting parties plays a vital role in enhancing the performance of the project. This research presents a new quantitative risk allocation approach by integrating fuzzy logic and bargaining game theory. Owing to the imprecise and uncertain nature of players’ payoffs at different risk allocation strategies, fuzzy logic is implemented to determine the value...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: JES. Journal of Engineering Sciences
سال: 2017
ISSN: 2356-8550
DOI: 10.21608/jesaun.2017.116893