Performance modelling of patient flow scheduling through a formal method
نویسندگان
چکیده
منابع مشابه
Mathematical modelling of Sisko fluid flow through a stenosed artery
In the present study, the nonlinear model of non-Newtonian blood flow in cosine-shape stenosed elastic artery is numerically examined. The model is carried out for axisymmetric, two-dimensional and fully developed blood flow. The vessel wall is assumed to be have time-dependent radius that is important factor for study of blood flow. The cosine-shape stenosis convert to rigid artery by using a ...
متن کاملmathematical modelling of sisko fluid flow through a stenosed artery
in the present study, the nonlinear model of non-newtonian blood flow in cosine-shape stenosed elastic artery is numerically examined. the model is carried out for axisymmetric, two-dimensional and fully developed blood flow. the vessel wall is assumed to be have time-dependent radius that is important factor for study of blood flow. the cosine-shape stenosis convert to rigid artery by using a ...
متن کاملModelling and Scheduling Lot Streaming Flexible Flow Lines
Although lot streaming scheduling is an active research field, lot streaming flexible flow lines problems have received far less attention than classical flow shops. This paper deals with scheduling jobs in lot streaming flexible flow line problems. The paper mathematically formulates the problem by a mixed integer linear programming model. This model solves small instances to optimality. Moreo...
متن کاملmodelling and scheduling lot streaming flexible flow lines
although lot streaming scheduling is an active research field, lot streaming flexible flow lines problems have received far less attention than classical flow shops. this paper deals with scheduling jobs in lot streaming flexible flow line problems. the paper mathematically formulates the problem by a mixed integer linear programming model. this model solves small instances to optimality. moreo...
متن کاملFormal DEVS modelling and simulation of a flow-shop relocation method without interrupting the production
This paper presents an organisational method to keep the production going during the removal of a flowshop. Assume a flow-shop system is to be moved on a new site and its production has to continue, our method can be applied to follow requests for the removal period. The method works as follows: we segment the removals in groups of machines and move them ones after the others. This method can b...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Shanghai Jiaotong University (Science)
سال: 2017
ISSN: 1007-1172,1995-8188
DOI: 10.1007/s12204-017-1801-0