PERHITUNGAN CHANGE ORDER PROYEK JALAN DI BANTEN

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

solution of the rst order fuzzy di erential equations with generalized di erentiability

in this paper, we study rst order linear fuzzy di erential equations with fuzzy coecient and initial value. we use the generalized di erentiability concept and apply the exponent matrix to present the general form of their solutions. finally, one example is given to illustrate our results.

متن کامل

Bimal Jalan: India and Globalisation (Central Bank Articles and Speeches)

I am personally grateful to the President of the Indian Statistical Institute, Prof. M.G.K.Menon and Director, Prof. K.B.Sinha, for inviting me to be a part of this occasion. A scientist, a scholar and a public figure, Prof. Menon has led this Institute with great distinction. He has been a source of inspiration for all those connected with ISI and its teachers and students. It is a particular ...

متن کامل

Fourth - order nite di erence simulation of a di erentially heated cavity

We present benchmark simulations for the 8:1 di erentially heated cavity problem, the focus of a special session at the rst MIT conference on Computational Fluid and Solid Mechanics in June 2001. The numerical scheme is a fourth-order nite di erence method based on the vorticity-stream function formulation of the Boussinesq equations. The momentum equation is discretized by a compact scheme wit...

متن کامل

Oscillation of Second-Order Neutral Di¤erential Equations

We study oscillatory behavior of a class of second-order neutral di¤erential equations relating oscillation of these equations to existence of positive solutions to associated first-order functional di¤erential inequalities. Our assumptions allow applications to di¤erential equations with both delayed and advanced arguments, and not only. New theorems complement and improve a number of results ...

متن کامل

Noncommutative Di erential Geometry with Higher Order Derivatives

We build a toy model of di erential geometry on the real line, which includes derivatives of the second order. Such construction is possible only within the framework of noncommutative geometry. We introduce the metric and brie y discuss two simple physical models of scalar eld theory and gauge theory in this geometry. TPJU 2/94 hep-th/9401146 January 1994 Partially supported by KBN grant 2 P30...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Jurnal Muara Sains, Teknologi, Kedokteran dan Ilmu Kesehatan

سال: 2020

ISSN: 2579-6410,2579-6402

DOI: 10.24912/jmstkik.v4i2.6342