Piecewise Linear Model for Multiskilled Workforce Scheduling Problems considering Learning Effect and Project Quality

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Cuckoo Search Algorithm for Scheduling Multiskilled Workforce

Based on the situation of the construction and software industry, this paper presents a multi-skilled human resource scheduling model which considers the skill and the salary of the workforce at different levels. It introduces a novel cuckoo search (CS)-based approach to optimize the objective function which combines the minimization of the makespan and the project cost. The proposed approach t...

متن کامل

a model to solve project scheduling and staff assignment problems

the allocation of human resources to project activities in order to schedule them is one of the closest states to the actual conditions of scheduling problems. but regarding the fact that this problem belongs to the class of np-hard problems; so far the exact methods have only been able to solve the small size problems. in this study, the renewable resources are humans in a way that every staff...

متن کامل

A Mathematical Programming Model for Flow Shop Scheduling Problems for Considering Just in Time Production

  In this paper, we consider a flow shop scheduling problem with bypass consideration for minimizing the sum of earliness and tardiness costs. We propose a new mathematical modeling to formulate this problem. There are several constraints which are involved in our modeling such as the due date of jobs, the job ready times, the earliness and the tardiness cost of jobs, and so on. We apply adapte...

متن کامل

A stochastic model for project selection and scheduling problem

Resource limitation in zero time may cause to some profitable projects not to be selected in project selection problem, thus simultaneous project portfolio selection and scheduling problem has received significant attention. In this study, budget, investment costs and earnings are considered to be stochastic. The objectives are maximizing net present values of selected projects and minimizing v...

متن کامل

Modeling and Solution Procedure for a Preemptive Multi-Objective Multi-Mode Project Scheduling Model in Resource Investment Problems

In this paper, a preemptive multi-objective multi-mode project scheduling model for resource investment problem is proposed. The first objective function is to minimize the completion time of project (makespan);the second objective function is to minimize the cost of using renewable resources. Non-renewable resources are also considered as parameters in this model. The preemption of activities ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Mathematical Problems in Engineering

سال: 2016

ISSN: 1024-123X,1563-5147

DOI: 10.1155/2016/3728934