Planned lead times optimization for multi-level assembly systems under uncertainties

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Genetic algorithm for multi-level assembly systems under stochastic lead times

The aim of this paper is to propose tools to adapt and parameterize the Material Requirement Planning (MRP) method under lead time uncertainty. We study multi-level assembly systems with one type of finished products and several types of components. We consider that each component has a fixed unit inventory cost and the finished product has a backlogging cost per unit of time. The lead times of...

متن کامل

Mathematical Model for Supply Planning of Multi-Level Assembly Systems with Stochastic Lead Times

The deal for industrial companies is to satisfy their customers with the best quality, the most reliable lead times, and the lowest costs. One of the keys to achieve it is in the inventory control in the Supply Chain. Moreover, it is mandatory to possess necessary components in order to produce the requested products by the due date. But, as the components lead time is an unpredictable paramete...

متن کامل

Multi-objective supply planning for two-level assembly systems with stochastic lead times

This paper considers two-level assembly systems whose lead times of components are stochastic with known discrete random distributions. In such a system, supply planning requires determination of release dates of components at level 2 in order to minimize expected holding cost and to maximize customer service. Hnaien et al. [Hnaien F, Delorme X, Dolgui A. Multi-objective optimization for invent...

متن کامل

Reducing the Research Space of Possible Order Release Dates for Multi-level Assembly Systems under Stochastic Lead Times

This paper proposes tools which will be used to optimize multi-level assembly under lead time uncertainty. One type of finished products and several types of components are considered. We suppose that each component has a fixed unit inventory cost and the finished product has backlogging and inventory holding costs per unit of time. The lead times of components are discrete random variables, an...

متن کامل

Multi-Objective Lead Time Control in Multistage Assembly Systems (TECHNICAL NOTE)

In this paper we develop a multi-objective model to optimally control the lead time of a multistage assembly system. The multistage assembly system is modeled as an open queueing network, whose service stations represent manufacturing or assembly operations. The arrival processes of the individual parts of the product, which should be assembled to each other in assembly stations, are assumed to...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Omega

سال: 2018

ISSN: 0305-0483

DOI: 10.1016/j.omega.2017.11.004