Plant Planning Optimization under Time-Varying Uncertainty: Case Study on a Poly(vinyl chloride) Plant

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Time-Varying Optimal Disturbance Minimization in Presence of Plant Uncertainty

The optimal robust disturbance rejection problem plays an important role in feedback control theory. Here its time-varying version is solved explicitly in terms of duality and operator theory. In particular, the optimum is shown to satisfy a time-varying allpass property. Moreover, optimal performance is given in terms of the norm of a bilinear form. The latter depends on a lower triangular pro...

متن کامل

Multi-Cost Optimal Route Planning Under Time-Varying Uncertainty

Different uses of a road network call for the consideration of different travel costs: in route planning, travel time and distance are typically considered, and green house gas (GHG) emissions are increasingly being considered. Further, costs such as travel time and GHG emissions are time-dependent and uncertain. To support such uses, we propose techniques that enable the construction of a mult...

متن کامل

Multi-robot planning under uncertainty with communication: a case study

Although Dec-POMDP techniques can be useful to modeling a wide range of problems, their practical application is limited by the inherent computational complexity of the algorithms currently available to solve such models. The application of these techniques is typically restricted to theoretical examples. This work studies the application of a particular type of Dec-POMDP (a multiagent POMDP) m...

متن کامل

Consumption Adjustment under Time-varying Income Uncertainty

We study the effect of income uncertainty on consumption in a model that includes precautionary saving. In contrast to previous studies, we focus on time-series variation in income uncertainty. Our time-series measure of income uncertainty is constructed from a panel of forecasts. We find evidence of precautionary saving in that increases in income uncertainty are related to increases in aggreg...

متن کامل

Planning Under Temporal Uncertainty Using Hindsight Optimization

A robot task planner must be able to tolerate uncertainty in the durations of commanded actions and uncertainty in the time of occurrence of exogenous events. Sophisticated temporal reasoning techniques have been proposed to deal with such issues, although few existing planners support them. In this paper, we demonstrate the capabilities of a much simpler technique, hindsight optimization, in w...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Industrial & Engineering Chemistry Research

سال: 2018

ISSN: 0888-5885,1520-5045

DOI: 10.1021/acs.iecr.8b02101