Post-upgrade performance of GERDA Phase II
نویسندگان
چکیده
منابع مشابه
Status Report of the GERDA Phase II Startup
The GERmanium Detector Array (GERDA) experiment, located at the Laboratori Nazionali del Gran Sasso (LNGS) of INFN, searches for 0νββ of Ge. Germanium diodes enriched to ∼ 86 % in the double beta emitter Ge(Ge) are exposed being both source and detectors of 0νββ decay. Neutrinoless double beta decay is considered a powerful probe to address still open issues in the neutrino sector of the (beyon...
متن کاملThe Phase II ATLAS Pixel Upgrade: The Inner Tracker (ITk)
The entire tracking system of the ATLAS experiment will be replaced during the LHC Phase II shutdown (foreseen to take place around 2025) by an all-silicon detector called the ITk (Inner Tracker). The pixel detector will comprise the five innermost layers, and will be instrumented with new sensor and readout electronics technologies to improve the tracking performance and cope with the HL-LHC e...
متن کاملUPGRADE Vol. II, No. 5
Continuing technical advances will soon lead to an abundance of very small and very cheap microprocessors, which are equipped with sensors and have wireless communication capabilities. Information processing will then become ubiquitous and will permeate almost every type of object. We illustrate the vision of Mark Weiser, the visionary behind ubiquitous computing, and describe its technical fou...
متن کاملDØ Upgrade for RUN II
The DØ detector at The Fermilab Tevatron is undergoing a major upgrade to prepare for data taking with luminosities reaching 2× 10 cm s. The upgrade includes a new central tracking array, new muon detector components and electronic upgrades to many subsystems. The DØ upgraded detector will be operational for RUN II in spring 2000.
متن کاملGas Turbine Performance Upgrade Options
Comprehensive upgrades of gas turbine involve the replacement of “flange-to-flange” parts with more advanced designs. Because late-model gas turbines already incorporate advanced technology, these comprehensive upgrades apply only to older gas turbines that are part of a series or model line that the original equipment manufacturer (OEM) has redesigned. Examples of these model lines include the...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Physics: Conference Series
سال: 2020
ISSN: 1742-6588,1742-6596
DOI: 10.1088/1742-6596/1468/1/012109