POTENSI PENGEMBANGAN KAWASAN TRANSIT ORIENTED DEVELOPMENT (TOD) PADA LINTASAN BRT TRANS JATENG KORIDOR UNGARAN-BAWEN

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

on transit-oriented development (tod) and the criteria for determining tod centers: the case of shiraz metro line i

the current status and quality of urban and regional development has been criticized by many academics and professionals in different fields. at city centers in addition to traffic congestion, population growth, urban and regional sprawl and suburbanization have resulted in unsustainable conditions in many cities all around the world. in this regard, different aspects of urban form, especially ...

متن کامل

Regulatory and Incentive Mechanisms to implement Transit Oriented Development (TOD) in South East Queensland

The Queensland Government recently released a statutory planning document South East Queensland Regional Plan 2005-2026 to manage the rapid growth of its south east region. One of the strategies identified in the document is to establish a number of transit-oriented developments (TODs) to create compact, walkable communities around high capacity public transport nodes. The objective of the pape...

متن کامل

Strengths and Weakness of Bus in Relation to Transit Oriented Development

While Transit Oriented Development (TOD) has almost exclusively concerned rail based modes there has been a recent interest in bus related TOD with an emphasis on new bus rapid transit (BRT) developments in North/ South America and Australia. This paper takes a critical look at the strengths and weakness of bus based transit systems in relation to TOD through a review of the literature and an a...

متن کامل

Network design for personal rapid transit under transit-oriented development

This study addresses guideway network design for personal rapid transit (PRT) favoring transit-oriented development. The guideway network design problem seeks to minimize both the guideway construction cost and users’ travel time. In particular, a set of optional points, known as Steiner points, are introduced in the graph to reduce the guideway length. The model is formulated as a combined Ste...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Desa-Kota

سال: 2020

ISSN: 2656-5528

DOI: 10.20961/desa-kota.v2i2.40015.217-231