Precisely positioning pallets in multi-station assembly systems

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Precisely positioning pallets in multi-station assembly systems

In multi-station assembly systems, common for mass-customization manufacturing strategies, the product being assembled is held in a fixture attached to a pallet, and the pallet is conveyed between workstations. In high-precision assembly systems, variation in the position of the pallet is one of the largest sources of variation within the error budget, reducing quality and yields. Conventional ...

متن کامل

Kinematic Couplings for Pallets in Flexible Assembly Systems

Flexible assembly systems use conveyors to transfer products through a series of workstations. The product being assembled is typically held in a fixture mounted on top of a pallet. Conventional approaches for locating the pallets often use precision ground pins and bushings for location. This technique requires clearance between the pin and bushings to accommodate manufacturing variation and p...

متن کامل

Process-oriented tolerancing for multi-station assembly systems

YU DING,1 JIONGHUA JIN,2 DARIUSZ CEGLAREK3 and JIANJUN SHI4 1Department of Industrial Engineering, Texas A&M University, College Station, TX 77843, USA E-mail: [email protected] 2Department of Systems and Industrial Engineering, The University of Arizona, Tucson, AZ 85721, USA E-mail: [email protected] 3Department of Industrial Engineering, University of Wisconsin—Madison, Madison, WI ...

متن کامل

A chance-constrained multi-objective model for final assembly scheduling in ATO systems with uncertain sub-assembly availability

A chance-constraint multi-objective model under uncertainty in the availability of subassemblies is proposed for scheduling in ATO systems. The on-time delivery of customer orders as well as reducing the company's cost is crucial; therefore, a three-objective model is proposed including the minimization of1) overtime, idletime, change-over, and setup costs, 2) total dispersion of items’ deliver...

متن کامل

Multi-Objective Lead Time Control in Multistage Assembly Systems (TECHNICAL NOTE)

In this paper we develop a multi-objective model to optimally control the lead time of a multistage assembly system. The multistage assembly system is modeled as an open queueing network, whose service stations represent manufacturing or assembly operations. The arrival processes of the individual parts of the product, which should be assembled to each other in assembly stations, are assumed to...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Precision Engineering

سال: 2004

ISSN: 0141-6359

DOI: 10.1016/j.precisioneng.2002.11.003