Prescribing net demand for two-stage electricity generation scheduling

نویسندگان

چکیده

We consider a two-stage generation scheduling problem comprising forward dispatch and real-time re-dispatch. The former must be conducted facing an uncertain net demand that includes non-dispatchable electricity consumption renewable power generation. latter copes with the plausible deviations respect to schedule by making use of balancing during actual operation system. Standard industry practice deals in stage replacing it good estimate its conditional expectation (usually referred as point forecast), so minimize need for real time. However, is well known cost structure system highly asymmetric dependent on operating point, result minimizing amount imbalances not necessarily aligned costs. In this paper, we propose bilevel program construct, from available historical data, prescription does account system’s asymmetry. Furthermore, accommodate strong dependence clustering tailor proposed foreseen net-demand regime. By way illustrative example more realistic case study based European system, show our approach leads substantial savings compared customary doing.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Two-Stage Electricity Demand Modeling Using Machine Learning Algorithms

Forecasting of electricity demand has become one of the most important areas of research in the electric power industry, as it is a critical component of cost-efficient power system management and planning. In this context, accurate and robust load forecasting is supposed to play a key role in reducing generation costs, and deals with the reliability of the power system. However, due to demand ...

متن کامل

Demand Forecasting for Electricity

Introduction Forecasting demand is both a science and an art. Econometric methods of forecasting, in the context of energy demand forecasting, can be described as ‘the science and art of specification, estimation, testing and evaluation of models of economic processes’ that drive the demand for fuels. The need and relevance of forecasting demand for an electric utility has become a much-discuss...

متن کامل

A Two-Stage Chance-Constraint Stochastic Programming Model for Electricity Supply Chain Network Design

Development of every society is incumbent upon energy sector’s technological and economic effectiveness. The electricity industry is a growing and needs to have a better performance to effectively cover the demand. The industry requires a balance between cost and efficiency through careful design and planning. In this paper, a two-stage stochastic programming model is presented for the design o...

متن کامل

A Two-Stage Hybrid Flowshop Scheduling Problem with Serial Batching

In this paper the problem of serial batch scheduling in a two-stage hybrid flow shop environment with minimizing Makesapn is studied. In serial batching it is assumed that jobs in a batch are processed serially, and their completion time is defined to be equal to the finishing time of the last job in the batch. The analysis and implementation of the prohibited transference of jobs among the mac...

متن کامل

Two-stage column generation

We introduce a new concept in column generation for handling complex large scale optimization problems, called two-stage column generation, where columns for the compact and extensive formulation are simultaneously generated. The new framework is specifically conceived for tackling complex problems that cannot be efficiently solved by standard column generation and exploits the relationship bet...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Operations Research Perspectives

سال: 2023

ISSN: ['2214-7160']

DOI: https://doi.org/10.1016/j.orp.2023.100268