Proactive Project Scheduling With Activity Splitting and Resource Transfer Times Under Uncertain Environments

نویسندگان

چکیده

Proactive project scheduling aims to generate robust baseline schedules that are protected against the potential schedule disruptions during execution. In this paper, we propose a new problem named proactive resource-constrained with activity split-ting and resource transfer times, try investigate trade-off between benefits of splitting drawbacks resulting more times. The proposed is formulated into an integer programming model considering constraints maximum allowed number minimum period continuous Since NP-hard in strong sense, genetic algorithm then developed for solving. From obtained results designed computational experiment, prove effective solving defined problem, robustness improvement can be weaken times among subactivities. Besides, increase splitting, decrease execution time, extension deadlines, increases.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Uncertain Resource Availabilities: Proactive and Reactive Procedures for Preemptive Resource Constrained project Scheduling Problem

Project scheduling is the part of project management that deals with determining when intime to start (and finish) which activities and with the allocation of scarce resources to theproject activities. In practice, virtually all project managers are confronted with resourcescarceness. In such cases, the Resource-Constrained Project Scheduling Problem (RCPSP)arises. This optimization problem has...

متن کامل

A UNIFIED MODEL FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM WITH UNCERTAIN ACTIVITY DURATIONS

In this paper we present a unified (probabilistic/possibilistic) model for resource-constrained project scheduling problem (RCPSP) with uncertain activity durations and a concept of a heuristic approach connected to the theoretical model. It is shown that the uncertainty management can be built into any heuristic algorithm developed to solve RCPSP with deterministic activity durations. The esse...

متن کامل

Project Scheduling Problem with Uncertain Activity Duration Times

Project scheduling problem is to determine the schedule of allocating resources so as to balance the total cost and the completion time. This paper considers project scheduling problem with uncertain activity duration times and presents four new uncertain programming models for different management requirements. Moreover, taking advantage of some properties of uncertainty theory, these models c...

متن کامل

Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities

Research concerning project planning under uncertainty has primarily focused on the stochastic resource-constrained project scheduling problem (stochastic RCPSP), an extension of the basic RCPSP, in which the assumption of deterministic activity durations is dropped. In this paper, we introduce a new variant of the RCPSP for which the uncertainty is modeled by means of resource availabilities t...

متن کامل

Uncertain project scheduling problem with resource constraints

Project scheduling problem is to make a schedule for allocating the loans to a project such that the total cost and the completion time of the project are balanced under some constraints. This paper presents an uncertain project scheduling problem, of which both the duration times and the resources allocation times are uncertain variables. An uncertain programming model with multiple objectives...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IEEE Access

سال: 2022

ISSN: ['2169-3536']

DOI: https://doi.org/10.1109/access.2022.3196460