Proactive Resource Allocation Heuristics for Robust Project Scheduling

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

New Proactive Time Buffer Heuristics for Robust Project Scheduling *

Robust scheduling is aiming at constructing proactive schedules capable of dealing with multiple disruptions during project execution. Insertion a time buffer, before an activity start time, is a method to improve the robustness (stability) of a baseline schedule. In this paper, we introduce new heuristics for inserting time buffers in a given baseline schedule while the project due date is pre...

متن کامل

Uncertain Resource Availabilities: Proactive and Reactive Procedures for Preemptive Resource Constrained project Scheduling Problem

Project scheduling is the part of project management that deals with determining when intime to start (and finish) which activities and with the allocation of scarce resources to theproject activities. In practice, virtually all project managers are confronted with resourcescarceness. In such cases, the Resource-Constrained Project Scheduling Problem (RCPSP)arises. This optimization problem has...

متن کامل

A robust optimisation approach to project scheduling and resource allocation

In a rapidly changing and highly uncertain environment, Petri net-based project management systems can be used in the rescheduling (control reconfiguration) of projects, when unforeseen changes occur or new data estimates become available. However, having to reschedule the project after it has started can result in significant suboptimality due to increased cost. In this paper, we present a sol...

متن کامل

Static heuristics for robust resource allocation of continuously executing applications

We investigate two distinct issues related to resource allocation heuristics: robustness and failure rate. The target system consists of a number of sensors feeding a set of heterogeneous applications continuously executing on a set of heterogeneous machines connected together by high-speed heterogeneous links. There are two quality of service (QoS) constraints that must be satisfied: the maxim...

متن کامل

Hybrid Heuristics for Dynamic Resource-Constrained Project Scheduling Problem

Dynamic Resource-Constrained Project Scheduling Problem (DRCPSP) is a scheduling problem that works with an uncommon kind of resources: the Dynamic Resources. They increase and decrease in quantity according to the activated tasks and are not bounded like other project scheduling problems. This paper presents a new mathematical formulation for DRCPSP as well as two hybrid heuristics merging an ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: SSRN Electronic Journal

سال: 2006

ISSN: 1556-5068

DOI: 10.2139/ssrn.870228